ANALISIS FAKTOR PENYEBAB WASTE PADA PROYEK PEMBANGUNAN JALAN TOL BALIKPAPAN-SAMARINDA

Fitria Arwina Munawaroh, Oryza Lhara Sari

Abstract


In the implementation of construction projects, one of the problems that often occurs is inefficiency and waste. According to the Lean Construction Institute, in construction projects there is a lot of waste in the form of activities that use resources but do not add value (non-value adding). Project waste will become a problem and can increase project costs if not immediately anticipated. By eliminating waste in non-value-added activities and applying lean tools to essential value-added and non-value-added activities. In this toll road construction project, there is a problem in the form of delays in the construction process caused by several factors, one of which is related to land acquisition. Therefore, it is necessary to analyze the factors causing waste in the Balikpapan - Samarinda Toll Road Development Project. This research aims to find out the waste variables and the factors that cause the most frequent waste in the project. The method used in this research is Borda method. Borda method is used to rank the most frequent variables and factors. The result shows that the most frequent waste variable in Balikpapan - Samarinda Toll Road Construction Project is waiting time which has a weight of 0.187. Meanwhile, the factor causing the most frequent waste in the Balikpapan - Samarinda Toll Road Development Project is due to unfavorable weather which has a weight of 0.074.

Keywords


Borda, Factors, Waste

Full Text:

PDF

References


Abduh, M, 2007, Konstruksi Ramping : Memaksimalkan Value Dan Meminimalkan Waste, Fakultas Teknik Sipil Dan Lingkungan ITB, Bandung.

Adlin, R, 2016, Analisa Waste Material Konstruksi Dengan Aplikasi Metode Lean Construction (Studi Kasus : Proyek Pembangunan Showroom Auto 2000), Universitas Sumatera Utara, Medan.

EPA, 1998, Indoor Air Facts No.4 (Revised) : Sick Building Syndrome (SBS), Environmental Protection Agency, Washington, D.

Febianti, Evi, Herlina, H., dan Herfaisal, A., 2015, Analisis Proyek Konstruksi Menggunakan Critical Chain Project Management Dan Lean Construction Untuk Meminimasi Waste, Jurnal FT-UMJ, Banten.

Jakfar, A., Setiawan, W., Masudin, I., 2014, Pengurangan Waste Menggunakan Pendekatan Lean Manufacturing, Jurnal UMM, Malang.

Lansdowne, Z.F,. dan Woodward, B.S., 1996, Applying Borda Ranking Method, Air Force Jornal of Logistics, hal. 27-29.

Prisilia, Harliwanti, Purnomo, D.A., 2018, Aplikasi Metode Lean Project Management Dalam Perencanaan Proyek Konstruksi Pada Pembangunan Gedung SMU Negeri 1 Kabupaten Banyuwangi, Jurnal Teknik Waktu, Banyuwangi.

Wang, C.W., dan Leung, H.L., 2004, A Secure and Fully Private Borda Voting Protocol with Universal Verifiability, COMPSAC.




DOI: http://dx.doi.org/10.20527/infotek.v23i1.13855

DOI (PDF): http://dx.doi.org/10.20527/infotek.v23i1.13855.g8235

Article Metrics

Abstract view : 619 times
PDF - 733 times

Refbacks

  • There are currently no refbacks.


Copyright (c) 2022 INFO-TEKNIK

Creative Commons License
This work is licensed under a�Creative Commons Attribution 4.0 International License.�

joomla
statistics View My Stats

Indexed By:

Citation :

SINTA 6 mulai Vol. 19 No. 2 2018 (SK NO. 164/E/KPT/2021)

GOOGLE SCHOLAR : Sitasi = 78, H-index = 5, i10-index = 2

IPI :� Artikel = 100

IOS 3969 : Artikel = 239