Identifikasi Faktor Penyebab Waste Dengan Menggunakan Pendekatan Lean Construction Pada Proyek Pembangunan Jembatan Sei Alalak Banjarmasin
Abstract
Kata kunci: Konstruksi Ramping, Limbah, Jembatan Sei Alalak
Keywords
Full Text:
PDFReferences
Fertilia, Novika Candra, dan Dian Andaka. 2021. “Analysis of the Causes of Waste with the Lean Construction Method on the 1700 Units Apartment Algeria Project.” World Conference on Civil Engineering.
Formoso, Carlos T, Lucio Soibelman M.ASCE, Claudia De Cesare, dan Eduardo L Isatto. 2002. “Material Waste in Building Industry : Main Causes and Prevention.” Journal Of Construction Engineering Management 128 (4): 316–25.
Kololu, Welmy, dan B J Camerling. 2017. “Tinjauan Penggunaan Metode Lean Construction Pada Proyek Konstruksi (Studi Kasus Pada Pesona Alam Estate).” Arika 11 (2).
Koskela. 1992. “Application Of The New Production Philosophy To Construction.” #72.
Putra, I Gusti Putu A S P, G A P Candra Dharmayanti, dan A A Diah Parami Dewi. 2018. “Penanganan Waste Material Pada Proyek Konstruksi Gedung Bertingkat.” Jurnal Spektran 6 (2): 176–85.
Suripto, dan Ajeng Ratna Susanti. 2021. “Evaluasi Waste dan Implementasi Lean Construction Proyek Gedung Kampus X.” Jurnal Rivet (Riset dan Invensi Teknologi) 01 (02): 65–72.
DOI: http://dx.doi.org/10.20527/infotek.v23i1.14293
DOI (PDF): http://dx.doi.org/10.20527/infotek.v23i1.14293.g8339
Article Metrics
Abstract view : 635 timesPDF - 371 times
Refbacks
- There are currently no refbacks.
Copyright (c) 2022 INFO-TEKNIK
This work is licensed under a�Creative Commons Attribution 4.0 International License.�
Indexed By:
Citation :
SINTA 6 mulai Vol. 19 No. 2 2018 (SK NO. 164/E/KPT/2021)GOOGLE SCHOLAR : Sitasi = 78, H-index = 5, i10-index = 2
IPI :� Artikel = 100
IOS 3969 : Artikel = 239
�