IDENTIFIKASI FAKTOR PENYEBAB WASTE KONSTRUKSI DENGAN MENGGUNAKAN PENDEKATAN LEAN CONSTRUCTION (STUDI KASUS: PROYEK X KABUPATEN KAPUAS)

Doni Rahman Maulana

Abstract


Waste is a problem that often occurs in construction projects. Waste is an activity that utilizes resources but does not produce the expected added value. Waste can be eliminated with a lean approach where this approach is carried out by identifying and eliminating waste so that it can meet customer value. Therefore, it is necessary to identify waste, in this study to identify the factors causing the occurrence of construction waste in the rehabilitation and improvement of irrigation networks in the working area of block A, Kapuas Regency. There were 9 variables with 43 indicators of factors causing waste which became the basis for this research. The method used was the Borda method to get the factors causing the most frequent waste and also the severity index method to get the main factors causing the occurrence of waste. The results of this study are the waste that most often occurs, namely the planning error factor with a weight value of 0.031 and the main factor for the occurrence of waste, namely the planning error factor with an SI probability weight of 46.7% including category C (Enough) with a value of 3 while the SI impact weight is 65% belongs to category B (Large) with a value of 4

Keywords


Teknik Sipil

Full Text:

PDF

References


Abduh, M., 2007, Konstruksi Ramping: Memaksimalkan Value dan Meminimalkan Waste, Fakultas Teknik Sipil dan Lingkungan, Institut Teknologi Bandung.

Al-Moghany, S.S., 2006, Managing and Minimizing Construction Waste in Gaza Strip. Islamic University of Gaza, Palestine.

Alwi, S., Mohamed, S., & Hampson, K., 2002, Waste in the Indonesian construction projects. In Proceedings of the 1st CIB-W107 International Conference-Creating a Sustainable Construction Industry in Developing Countries (pp. 305-315), CSIR.

Archia, Itqan, 2012, Penerapan Metode Lean Construction dan Penjadwalan Critical Chain Project Management Dalam Pembangunan Proyek Konstruksi Gedung Universitas Widya Mandala (UWM) Surabaya, Doctoral dissertation, Institut Teknologi Sepuluh Nopember.

Ariyanti, F. D., Putri, A. C., & Ningtyas, D. A., 2021, Implementation of Lean Construction and critical chain project management (CCPM) for Waste management and work estimation on the Ciawi dam construction project, In IOP Conference Series: Earth and Environmental Science (Vol. 794, No. 1, p. 012074), IOP Publishing

Koskela, L dkk., 2002,The Foundation of Lean Construction. In: Best R., and Valence, G. D., eds. Design and Construction: Building in Value, Butterworth-Heinemann, 211- 255.




DOI: http://dx.doi.org/10.20527/infotek.v25i1.16187

DOI (PDF): http://dx.doi.org/10.20527/infotek.v25i1.16187.g10438

Article Metrics

Abstract view : 82 times
PDF - 62 times

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 INFO-TEKNIK

Creative Commons License
This work is licensed under a�Creative Commons Attribution 4.0 International License.�

joomla
statistics View My Stats

Indexed By:

Citation :

SINTA 6 mulai Vol. 19 No. 2 2018 (SK NO. 164/E/KPT/2021)

GOOGLE SCHOLAR : Sitasi = 78, H-index = 5, i10-index = 2

IPI :� Artikel = 100

IOS 3969 : Artikel = 239