This paper discusses the handling of slope sliding occured in the segment of Bambangan – Aji kuning East Borneo. The slide occurs because of unprotected slopes and soil types in the form of silt sandy. Treatment methods cantilever retaining walls was designed inorder to handle the sliding. The cost of the this method was also calculated to obtain the price.

Soil investigation and topography data were collected as a secondary data. The design was commenced by preliminary design for this method. The next step was continued with the calculation of safety factor of sliding, overtuning, and bearing capacity. For cantilever, the design was included the calculation of reinforcement. Overal stability of slope was performed using Plaxis Professional 8.2. The cost analysis was performed using Bina marga 2010 method.

By using the cantilever, the dimension of the pedestal are 3m wide, 0.5 m thick matsand wall and 5m high. the safety factor of overal stability for both method was higher than that of caltilever wall.. The cost of the reinforcement using cantilever Rp 489.373.268,.


Keywords


The landslide, Cantilever, Safety Factor.

Full Text:

PDF

References


Badan Standarisasi Nasional/ BSN. 2002. Kumpulan Analisa Biaya Konstruksi Bangunan Gedung dan Perumahan(SNI Revisi)

Das, B. M. (1990). Principles Of Foundation Enginering. PWS-Kent. Boston.

Djojowirono, Sugeng. 1984. Manajemen Konstruksi. Yogyakarta.

Hardiyatmo, H. C. (2003). Mekanika Tanah II. Edisi Ketiga. Gadjah Mada University Press. Yogyakarta.

Hardiyatmo, H. C. (2006). Teknik Pondasi I. Cetakan Ketiga. Gadjah Mada University . Yogyakarta.

Hardiyatmo, H. C. (2007). Mekanika Tanah II. Edisi Keempat. Gadjah Mada University Press. Yogyakarta.

Ibrahim, Bachtiar. 1993. Rencana dan Estimate Real of Cost. PT.Bumi Aksara. Jakarta.

Niron, John W. 1992. Pedoman Praktis Anggaran dan Borongan Rencana Anggaran Biaya Bangunan.

Mukomoko,J.A. 1987. Dasar Penyusunan Anggaran Biaya Bangunan.

Nurpratiwi, P. (2010). Studi Penggunaan Geotekstil Untuk Timbunan Badan Jalan di Daerah Rawa. Skripsi/Tugas Akhir Program Studi Teknik Sipil Fakultas Teknik. Universitas Lambung Mangkurat. Banjarbaru.

Pranata, H. (2010). Analisis Dinding Penahan Tanah Dengan Perhitungan Manual dan Kontrol Gaya – Gaya Dalam Yang Bekerja Pada Dinding Penahan Tanah dengan Metode SAP 200 Plane-Strain. Proyek Akhir Program Studi Diploma III Teknik Sipil dan Perencanaan Fakultas Teknik. Universitas Negeri Yogyakarta. Yogyakarta.

Setiawan, G. 2007. Penggunaan Vegetasi (Rumput Gajah) Dalam Menjaga Kesetabilan Tanah Terhadap Kelongsoran. Jurnal Ilmiah Teknik Sipil. Vol. 11 No. 1 Januari 2007. Hal. 13.




DOI: http://dx.doi.org/10.20527/infotek.v14i2.303

DOI (PDF): http://dx.doi.org/10.20527/infotek.v14i2.303.g244

Article Metrics

Abstract view : 230 times
PDF - 1914 times

Refbacks

  • There are currently no refbacks.


Copyright (c) 2016 INFO-TEKNIK

Creative Commons License
This work is licensed under a�Creative Commons Attribution 4.0 International License.�

joomla
statistics View My Stats

Indexed By:

Citation :

SINTA 6 mulai Vol. 19 No. 2 2018 (SK NO. 164/E/KPT/2021)

GOOGLE SCHOLAR : Sitasi = 78, H-index = 5, i10-index = 2

IPI :� Artikel = 100

IOS 3969 : Artikel = 239