Table of Contents
Articles
PENENTUAN INTERVAL WAKTU PERAWATAN MESIN INJECTION MOULDING MENGGUNAKAN METODE RCM DI PT “X”
Abstract view : 4 times
DOI: 10.20527/infotek.v22i2.12384
Alfian Muhtadi, Etik Puspitasari
|
141-156
|
PENGGUNAAN KERIKIL PECAH SUNGAI KAHAYAN SEBAGAI ALTERNATIF AGREGAT KASAR PADA CAMPURAN HOT ROLLED SHEET-BASE (HRS-BASE)
Abstract view : 1 times
DOI: 10.20527/infotek.v22i2.12385
Hendri Hermanto, Desriantomy Desriantomy, Salonten Salonten
|
157-172
|
KAJIAN MATERIAL SEDIMEN PANTAI BALIKPAPAN UNTUK MENGETAHUI VARIASI UKURAN BUTIR PARTIKEL PASIR (SAND) SEDIMEN
Abstract view : 3 times
DOI: 10.20527/infotek.v22i2.12391
Rohima Sera Afifah, Karmila Karmila, Nuruddin Kafy El-Ridlo
|
173-184
|
STUDI KELAYAKAN PEMBANGUNAN INSTALASI PENGOLAHAN AIR TIPE REVERSE OSMOSIS UNTUK SUMBER AIR PERMUKAAN DI KOTA BALIKPAPAN
Abstract view : 4 times
DOI: 10.20527/infotek.v22i2.12078
Widya Mulya
|
185-194
|
PENGARUH ORIENTASI SERAT DAN WAKTU ALKALISASI PADA LAMINATES COMPOSITE POLYESTER-SERAT BEMBAN (DONAX CANNIFORMIS) TERHADAP KEKUATAN BENDING, IMPACT DAN BENTUK PATAHAN
Abstract view : 2 times
DOI: 10.20527/infotek.v22i2.12387
Akhmad Syarief, Achmad Azhar Basyir, Andy Nugraha Andy Nugraha
|
209-226
|
ANALISIS TINGKAT KERAWANAN DAN MITIGASI BANJIR PERKOTAAN DI KECAMATAN PULAU LAUT UTARA KABUPATEN KOTABARU
Abstract view : 6 times
DOI: 10.20527/infotek.v22i2.12388
Irwan Azhar, Widy Afyat
|
227-238
|
KONSTRUKSI INSTALASI PIPA MIGAS BAWAH LAUT DI TELUK BALIKPAPAN
Abstract view : 5 times
DOI: 10.20527/infotek.v22i2.12389
Sulardi Sulardi
|
239-248
|