Sinkronisasi peralatan mekanis pada pemindahan lapisan tanah penutup: studi kasus PT Akbar Mitra Jaya
Abstract
Keywords
Full Text:
PDFReferences
E. Suwandi, A. Annisa, and K. S. Putri, "Evaluasi produktivitas alat gali muat untuk material overburden di CV Gunung Sambung," Jurnal Himasapta, vol. 7, no. 2, pp. 97-102, 2022.
Y. Lisnawati, U. Saismana, and E. Santoso, "Pengaruh coverage terhadap produktivitas alat gali-muat di PT Pama Persada Nusantara jobsite PT Adaro Indonesia," Jurnal Himasapta, vol. 6, no.2, pp. 105-110, 2021.
F. A. Putra, E. Santoso, and K. S. Putri, "Kajian optimasi kombinasi peralatan mekanis pada kegiatan backfilling tambang PD Baramarta Provinsi Kalimantan Selatan," Jurnal Himasapta, vol. 6, no. 2, pp. 73-78, 2021.
E. Santoso, et al., "Aplikasi pendekatan metode probabilistik dalam menentukan match factor alat mekanis di PT Sinar Nirwana Sari," Jurnal Himasapta, vol. 8, no. 2, pp. 73-82, 2023.
A. Assidiqi, et al., "Optimalisasi Produktivitas Alat Gali Muat dan Angkut pada Kegiatan Pengupasan Overburden untuk Mencapai Target Produksi Optimizing Productivity of Digging-Loading and Hauling Equipment on Overburden Stripping Activity to Achieve Production Targets," Jurnal GEOSAPTA, vol. 8, no .02, 2022.
Z. M. H. Fraditos, Y. S. Novianti, and K. S. Putri, "Kajian keserasian jumlah alat mekanis dengan fleet yang heterogen pada aktivitas pemuatan batubara di Stockpile CP 02 PT Binuang Mitra Bersama," Prosiding Temu Profesi Tahunan PERHAPI, pp. 531-538, 2020.
R. Erwanda, A. Y. Ridwan, and P. S. Muttaqin, "Optimization of Heavy Equipment Costs in Coal Mining Overburden Production Using Match Factor and Linear Programming," Conference on Broad Exposure to Science and Technology 2021 (BEST 2021). Atlantis Press, 2022.
A. Molaei, et al. "Automatic estimation of excavator actual and relative cycle times in loading operations," Automation in Construction, vol. 156, p.105080, 2023.
A. Soofastaei, et al. "A discrete-event model to simulate the effect of truck bunching due to payload variance on cycle time, hauled mine materials and fuel consumption," International journal of mining science and technology, vol. 26, no. 5, pp. 745-752, 2016.
E. S. P. Yuda, A. Triantoro, and U. Saismana, "Evaluasi pembongkaran overburden berdasarkan target produksi bulanan di PT Bhima Sakti Bersaudara," Jurnal Himasapta, vol. 7, no. 1, pp. 17-20, 2022.
D. Anggara, F. Franto, and G. Guskarnali, "Evaluasi match factor alat gali-muat dan angkut untuk meningkatkan produktivitas stripping overburden PT Cipta Kridatama," Jurnal Himasapta, vol. 9, no. 1, pp. 13-20, 2024.
Laporan Eksplorasi Tambang Batubara, PT Akbar Mitra Jaya, Kalimantan Selatan, 2014, hal. 2,20
Specifications & Application Handbook, Komatsu, Japan, 2017.
Specifications Articulate Dump Truck Generation 10, Terex, NewHouse Industrial Estate, Motherwell, 2017.
DOI: https://doi.org/10.20527/jhs.v9i1.12187
Refbacks
- There are currently no refbacks.
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Contact
Mining Engineering Study Program, Faculty of Engineering ULM
Jl. Jenderal Achmad Yani KM 35,5 Banjarbaru,
South Kalimantan – 70714
statistics counter
View My Stats Jurnal Himasapta
Jurnal Himasapta is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License