PERANCANGAN ULANG TATA LETAK FASILITAS DALAM MENINGKATKAN EFEKTIVITAS PRODUKSI (STUDI OBSERVASI PT. KALIMANTAN CONCRETE ENGGINERRING)

Rakhmat Fauzy, Qomariyatus Sholihah

Abstract


Industry is an economic activity that processes raw materials, raw materials, semi-finished goods or finished goods into high-quality goods in use, including engineering and engineering activities. Thus, industry is part of the production process. Industrial materials are taken directly or indirectly, then processed, resulting in more valuable goods for the community. In an industry not only concerns how much investment should be invested, production procedures and marketing of products but also requires the planning of facilities that include the location planning facility and facility design. Facility design includes facility system design, factory layout and material handling system (material transfer). (Wikipedia Bahasa Indonesia). In its current development PT. Kalimantan Concrete Engineering extends production land by purchasing a plot of land adjacent to the current production site, but it has not been enabled yet, in addition to the placement of U-dith and Box Culvert production which have not been placed in accordance with its area in the current name still in place at road front office and other areas that are still far apart. In accordance with the above explanation, we can know that the importance of an effective and efficient facility layout planning where it is in need in material handling arrangements, time efficiency, and the flow of work mobility. So this research is expected to be able to provide trobosan in the relationship layout facilities and improve the effectiveness of work better.

 

Keywords: PT. Kalimantan Concrete Engineering, ARC, MHPS, Efektivitas

Full Text:

PDF

References


Apple, JM. Tata Letak Pabrik dan Pemindahan Bahan. Bandung : Penerbit ITB, Terj. Nurhayati Mardiono.,1990.

Maheswari Hesti,Achmad Dany Firdauzy.2015. “Evaluasi Tata Letak Fasilitas Produksi Untuk Meningkatkan Efisiensi Kerja Pada Pt. Nusa Multilaksana. Fakultas Ekonomi”. Jakarta:Universitas Mercu Buana.

Susetyo Joko dkk.2010. “Perancangan Ulang Tata Letak Fasilitas Produksi Dengan Pendekatan Group Technology Dan Algoritma Blocplan Untuk Meminimasi Ongkos Material Handling”. yogyakarta:AKPRIND.

Nova St Meirizha. 2014. “Perancangan Ulang Tata Letak Fasilitas Pada Hanggar Pemeliharaan Pesawat Hawk 100/200 Di Pangkalan Udara Roesmin Nurjadin”. Riau: Program Studi Teknik Industri, Fakultas Teknik,Universitas Muhammadiyah.

Wignjosoebroto, sritomo. Tata letak pabrik dan pemindahan bahan. Surabaya: penerbit guna widya., 1996.




DOI: https://doi.org/10.20527/jtam_rotary.v1i2.1741

Refbacks

  • There are currently no refbacks.


JTAM ROTARY

Editorial Address

Department of Mechanical Engineering, Engineering Faculty, Lambung Mangkurat University

Jl. Jenderal Achmad Yani Km. 35,5 Banjarbaru Telp. (0511)-4773858 Fax. 0511-4773858.

HP: 0853-3262-2556 (Andy Nugraha) and 0821-5232-0035 (Herry Irawansyah)

E-mail: j[email protected], [email protected][email protected]

Home Page: http://bit.ly/JurnalRotary

Lisensi Creative Commons
JTAM ROTARY di bawah Lisensi Creative Commons Atribusi 4.0 Internasional.Department of Mechanical Engineering, Engineering Faculty,  Universitas Lambung Mangkurat