PENENTUAN INTERVAL WAKTU PERAWATAN MESIN INJECTION MOULDING MENGGUNAKAN METODE RCM DI PT “X”

Alfian Muhtadi, Etik Puspitasari

Abstract


In the industrialized world, product is the main of a production process that forms a production process system. In order to a system of production process running continuesly, need a maintenance of the equipment and production machines. The machine maintenance is needed to minimize the damage of machine then the machine can be used for a long time. The purpose of the study is to calculate the reliability value in which the interval time of maintenance will be determined so that it can support the reliability of the tool. Method of the study uses the RCM (Reliability Centered Maintenance) to solve machine maintenance problems that often occur at PT “X”. RCM method has the advantage of defining a machine focused maintenance program and avoids unnecessary maintenance activities by specifying appropriate maintenance intervals. This study also presents qualitative data in the form of FMEA analysis (Failure Mode Effect Analysis) and quantitative data in the form of determining reliability values and determining maintenance time intervals which provide a solution for PT. “X”.The result of the study, reliability value of the MJM-JLB-HQ Injection Moulding Machine is 0.9183 at 12 hours, VICTOR Injection Moulding is 0.9243 at 4 hours, and the reliability value of MJM-JLB 198-HQ Mould is 0.5125 at 96 hours, VICTOR's Mould is 0.5063 at 72 hours. For the results of maintenance interval to keep the value of reliability not going down below 0.9 is 12 hours for MJM-JLB198-HQ Injection Molding Machines, then 4 hours for VICTOR Injection Moulding Machines. The result maintenance interval analysis of mould with reliability not going down below the value of 0.5 is 96 hours on MJM-JLB198-HQ Injection Moulding Machine, and 72 hours at VICTOR Injection Moulding Machine.

Keywords


failure time, maintenance interval, maintenance time, RCM, reliability.

Full Text:

PDF

References


Alhilman, J., & Saedudin, R. (2011). RELIABILITY BASED PERFORMANCE ANALYSIS OF BASE TRANSCEIVER STATION (BTS) USING RELIABILITY, AVAILABILITY, AND MAINTAINABILITY (RAM) METHOD. In Proceeding of 9th International Seminar on Industrial Engineering and Management (pp. 1-6).

Pendidikan, S., Mesin, T., Teknik, F., Surabaya, U. N., Mesin, J. T., Teknik, F., & Surabaya, U. N. (2016). PERENCANAAN PERAWATAN MESIN INJECTION MOLDING DENGAN MENGGUNAKAN METODE REALIBILITY CENTERED MAINTENANCE DI PT . VICTORY PLASTIC Ferdian Arif Mulawarman Iskandar. 4(Cd), 99–110.

Susanto, A.D., & Azwir, H.H. (2018). Perencanaan Perawatan Pada Unit Kompresor Tipe Screw Dengan Metode RCM di Industri Otomotif. Jurnal Ilmiah Teknik Industri, 17(1), 21.

Kurniawan, Fajar. Rqp Teknik Dan Aplikasi Manajemen Perawatan Industri. Yogyakarta; Graha Ilmu, 2013 xviii + 168 hlm, 1 Jil.: 26 cm. ISBN: 978-602-262-037-2.

Suhara, D., Sumiardi, D., & Sulaeman. (2012). ANALISA SITEM PENJADWALAN PERAWATANMESIN DEPARTEMEN UTILITY DI PT. INDORAMA SYNTHETICS, Tbk DENGAN MENGGUNAKAN METODE MTBF. Jurnal Ilmiah Teknik Industri, 9–14.

Revitasari, C., Novareza, O., & Darmawan, Z. (2015). Teknik Industri Universitas Brawijaya Penentuan Jadwal Preventive Maintenance Mesin-Mesin Di Stasiun Gilingan (Studi Kasus Pg. Lestari Kertosono) 3(3), 485–494.

Al-alam, Fahmi. (2019). “Perencanaan Perawatan Gas Engine pada PT Perta Daya Gas Menggunakan Metode Reliability Centered Maintenance (RCM)”.Institut Teknologi Sepuluh Nopember Tugas Akhir.

Suwandy, R. (2019). Analisa Perawatan Mesin Digester Dengan Metode Reliability Centered Maintenance (Rcm) Pada Ptpn Ii Pagar Merbau. Fakultas Teknik Universitas Medan Area Medan. Skripsi

Munawir, H., & Yunanto, D. (2014). Analisa Penyebab Kerusakan Mesin Sizing Baba Sangyo Kikai dengan Metode Fmea dan Lta (Studi Kasus Di Pt Primatexco Indonesia). Seminar Nasional IENACO, 296–302.

Ramadhan, Zainul. (2018). “Penentuan Interval Waktu Preventive Maintenance pada Nail Making Machine dengan Menggunakan Metode Reliability Centered Maintenance (Rcm) Ii”. Tugas Akhir Universitas Muhammadiyah Sidoarjo.




DOI: http://dx.doi.org/10.20527/infotek.v22i2.12384

DOI (PDF): http://dx.doi.org/10.20527/infotek.v22i2.12384.g7750

Article Metrics

Abstract view : 898 times
PDF - 705 times

Refbacks

  • There are currently no refbacks.


Copyright (c) 2022 INFO-TEKNIK

Creative Commons License
This work is licensed under a�Creative Commons Attribution 4.0 International License.�

joomla
statistics View My Stats

Indexed By:

Citation :

SINTA 6 mulai Vol. 19 No. 2 2018 (SK NO. 164/E/KPT/2021)

GOOGLE SCHOLAR : Sitasi = 78, H-index = 5, i10-index = 2

IPI :� Artikel = 100

IOS 3969 : Artikel = 239