ANALISIS PRODUKTIVITAS PEKERJA DALAM PEKERJAAN PEMASANGAN BATA RINGAN PADA PROYEK PEMBANGUNAN GEDUNG SERBAGUNA POLRES DAN REHABILITASI RUANG KAPOLRES KOTA BANJARBARU
Abstract
The purpose of this study was to determine the coefficient/index value of the workers in the brick wall laying work cycle in the Polres Multipurpose Building Development project and the Kapolres Room Rehabilitation project in Banjarbaru City and to determine the coefficient comparison of bricklaying workers in the POLRES Multipurpose Building Construction project and Spatial Rehabilitation The Banjarbaru City Police Chief when compared with the 2022 Work Unit Price Analysis (AHSP). This research was conducted by observing the productivity level of 4 light brick laying workers.
From the data analysis that has been done, it can be seen that the coefficient or index of masons on the work of laying red brick walls on the construction project of the Banjarbaru Police Multipurpose Building and Kapolres Room Rehabilitation has an average of 0.064 OH. Meanwhile, the coefficient or masonry index according to Minister of Public Housing and Public Housing Regulation No. 1 of 2022 is 0.13 OH. This means that the coefficient or index value of the carpenter's data from the field is smaller in value compared to the coefficient or index in Regulation of the Minister of Public Affairs and Public Housing No. 1 of 2022. The percentage comparison of the coefficient or index of the masonry is obtained 0.066.
Keywords
Full Text:
PDFReferences
Ivan, P., Sampurna, S., Pintardi, H., & Ratnawidjaja, S.. Faktor-Faktor Yang Mempengaruhi Produktivitas Pekerja Dalam Bidang Konstruksi Di Surabaya. Jurnal Dimensi Pratama Teknik Sipil, 7(1), 258-264, 2018.
Kodri, I., Fitriani, H., & Juliantina, I. Analisis Pengaruh Pelatihan Dan Sertifikasi Terhadap Produktivitas Pekerja. Media Komunikasi Teknik Sipil, 24(1), 9-19, 2018
Lingga, RYS. Faktor-Faktor Yang Mempengaruhi Produktivitas Pekerja Pada Proyek Konstruksi Di Daerah Istimewa Yogyakarta. (Doctoral Dissertation, UAJY). 2017
Peraturan Menteri Pekerjaan Umum Dan Perumahan Rakyat Republik Indonesia Nomor 1 Tahun 2022 Tentang Pedoman Penyusunan Perkiraan Biaya Pekerjaan Konstruksi Bidang Pekerjaan Umum Dan Perumahan Rakyat. 2022
Riasiska, S., Bahrul, A., & Zuherna, M. Analisis Faktor-Faktor Yang Mempengaruhi Produktivitas Pelaksanaan Proyek Konstruksi Di Kota Sungai Penuh. (Doctoral Dissertation, Universitas Bung Hatta). 2021
Siagian, Sondang P. 2019. Manajemen Sumber Daya Manusia. Jakarta. Bumi Aksara. 2019
DOI: http://dx.doi.org/10.20527/infotek.v0i0.18643
DOI (PDF): http://dx.doi.org/10.20527/infotek.v0i0.18643.g9829
Article Metrics
Abstract view : 158 timesPDF - 150 times
Refbacks
- There are currently no refbacks.
Copyright (c) 2024 INFO-TEKNIK
This work is licensed under a�Creative Commons Attribution 4.0 International License.�
Indexed By:
Citation :
SINTA 6 mulai Vol. 19 No. 2 2018 (SK NO. 164/E/KPT/2021)GOOGLE SCHOLAR : Sitasi = 78, H-index = 5, i10-index = 2
IPI :� Artikel = 100
IOS 3969 : Artikel = 239
�