MANAJEMEN RISIKO PADA PROYEK GEDUNG BERTINGKAT DI BANJARMASIN

Candra Yuliana, Gawit Hidayat

Abstract


Process of implementation of the high building construction usually takes a long time and complex so it can cause uncertainty and various risks. The purpose of the research are analysis of the significant risks and determine the response to significant risks.

The research process is performed by survey. Data questionnaire analysis begins with risk identification through the study of literature, after it carried out a risk analysis conducted by distributing questionnaires to a number of respondents. Respondents are site manager, site engineer, logistics mechanics, team leader, supervising consultants. The risk analysis is done by estimating the likelihood that the biggest risk will occur and the resulting impact on costs and step time ast conduct risk response by way of interviews with selected respondents. Assessment of the risk by Severity Index and Probability Impact Grid. Based on the analysis found that the variable is a significant risk with respect to time, there are six kinds of risks as well as the response variable. While variable significant risks to cost, there are five kinds as well as its.


Keywords


Risks Management, risk identification, risk analysis, Severity Index and Probability Impact Grid

Full Text:

PDF

References


Project Managemen Institute, Inc. 2004 A Guide To The Project Managemen Body Of Knowledge(PMBOK).3rd edition. Newton Square, pnnsylvania. USA.

Ervianto, W. 2002. Manajemen Proyek konstruksi. Yogyakarta: ANDI.

Duffield, C&Trigunarsyah, B.1999. Project Management- Conception To Completion. Engineering Education Australia (EEA). Australia

Soeharto, I.1995. Manajemen Proyek dari konseptual sampai operasional. Erlangga. Jakrta.

Rahayu, P.H. 2001. Asuransi Contractor’s All Risk sebagai Alternatif Pengalihan Risiko Proyek Dalam Industri Konstruksi Indonesia. mbridge.

Flanagan, R & Norman,G. 1993, Risk Management and Construction.Blackwell Science, London

Darmawi, Herman.(2006). Manajemen Risiko. Cetakan Kesepuluh. Jakarta: Bumi Aksara.

Godfrey, P.S., Sir William Halcrow and Partners Ltd. 1996. Control of Risk A Guide to Systematic Management of Risk from Construction. Wesminster London: Construction Industry Research and Information Association(CIRIA). Crouhy M, Galai D Mark R. 2001. Risk Managemen. USA: McGraw Hill.

Soemarno, M.S. 2007, Risiko Penggunaan Lahan dan Analisisnya Laboratorium PPJP Jurusan Tanah. Malang: FBUP.




DOI: http://dx.doi.org/10.20527/infotek.v18i2.4350

DOI (PDF): http://dx.doi.org/10.20527/infotek.v18i2.4350.g3860

Article Metrics

Abstract view : 1508 times
PDF - 10985 times

Refbacks

  • There are currently no refbacks.


Copyright (c) 2018 INFO-TEKNIK

Creative Commons License
This work is licensed under a�Creative Commons Attribution 4.0 International License.�

joomla
statistics View My Stats

Indexed By:

Citation :

SINTA 6 mulai Vol. 19 No. 2 2018 (SK NO. 164/E/KPT/2021)

GOOGLE SCHOLAR : Sitasi = 78, H-index = 5, i10-index = 2

IPI :� Artikel = 100

IOS 3969 : Artikel = 239