COST AND TIME STUDY ON THE REHABILITATION PROJECT OF THE DIR. POLDER TAMBAK HANYAR IRRIGATION NETWORK IN BANJAR REGENCY USING THE EARNED VALUE METHOD

Indra Rusbandi, Candra Yuliana

Abstract


The implementation of construction projects often faces various issues that cause discrepancies between actual results and plans, both in terms of cost and time. Similar problems also occur in the Rehabilitation Project of the DIR. Polder Tambak Hanyar Irrigation Network in Banjar Regency, making it necessary to conduct an evaluation to ensure the project can return to running according to plan. One effective evaluation method that can be used is the earned value method, which allows for a comprehensive analysis of project performance by comparing the value of completed work with planned costs and timelines, enabling the project to identify issues and make appropriate decisions to address the discrepancies. In the earned value method, three indicators are used: planned value, earned value, and actual cost. This method also includes variance analysis, performance index analysis, and cost and time estimation analysis for project completion. The goal is to identify deviations related to costs and time, allowing for control measures to be implemented to manage costs and time effectively. The results of the analysis using the earned value method show that, in terms of time performance, delays occurred from the first week to the eighth week, with a Schedule Performance Index (SPI) below 1. Meanwhile, in terms of cost performance, the project experienced losses during the first, second, third, and fifth weeks, with a Cost Performance Index (CPI) below 1.

Keywords: earned value method, planned value, earned value, actual cost, cost and time evaluation.


Full Text:

PDF

References


Castollani, A., Puro, S., & Dewa, M. L., 2020, Cost and Time Analysis on an Apartment Project Using the Earned Value Concept, Journal of Construction Engineering and Civil Mechanics, Jogja.

Flemming, Q. W., & Koppleman, J. M., 1994, The Essence of Evolution Earned Value, Technical Article, Morgantown.

Soeharto, I., 1999, Project Management (From Conceptual to Operational) Second Edition, Erlangga, Jakarta.

Soemardi, B. W., & Kusumawardani, R. G., 2010, Practical Study on Indirect Cost Estimation in Construction Projects, 4th National Conference on Civil Engineering, Bali.

Soemardi, B. W., Abduh, M., Wirahadikusumah, R. D., & Pujoartanto, N., 2007, Earned Value Concept for Construction Project Management, Bandung Institute of Technology, Bandung.




DOI: https://doi.org/10.20527/crc.v10i1.18100

Refbacks

  • There are currently no refbacks.


Copyright (c) 2026 Indra Rusbandi, Candra Yuliana



Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License. 

joomla
statistics View My Stats

Indexed By:

 

GOOGLE SCHOLAR : Kutipan = 2, H-index = 1, i10-index = 0