|
Issue |
Title |
|
Vol 5, No 1 (2021): CERUCUK VOL. 5 NO. 1 JANUARY 2021 |
ALTERNATIVE IMPROVEMENT OF SUBGRADE AND REINFORCEMENT OF EMBANKMENT ON PELABUHAN KUALA TANJUNG TOLL ROAD, INDERAPURA - KUALA TANJUNG SECTION IN NORTH SUMATRA (STA 0+000 S/D STA 3+500) |
Abstract
|
Agung Wahyu Eka Prasetya, Hutagamissufardal Hutagamissufardal |
|
Vol 7, No 7 (2023): CERUCUK, VOL. 7 NO. 7 JULY 2023 |
ANALYSIS AND COMPARISON OF PILE BEARING CAPACITY BASED ON N-SPT, DYNAMIC METHOD, AND PILE DRIVING ANALYZER (PDA) IN MATARAMAN – SEI ULIN BRIDGE CONSTRUCTION PROJECT (MALI-MALI BRIDGE) |
Abstract
PDF
|
Taufik Alfazri, Gawit Hidayat |
|
Vol 5, No 2 (2021): CERUCUK VOL. 5 NO. 2 FEBRUARY 2021 |
ANALYSIS METHOD OF GRADUAL CAST INSITU PROJECT COMPLETION OVERPASS PT. TALENTA BUMI MARABAHAN |
Abstract
PDF
|
Akhmad Fitriadi |
|
Vol 8, No 1 (2024): CERUCUK VOL. 8 NO. 1 JANUARY 2024 |
Analysis of Factors of Labor Motivation in Banjarbaru City |
Abstract
PDF
|
Muhammad Nurhalis Majid |
|
Vol 8, No 5 (2024): CERUCUK VOL 8 NO. 5 MAY 2024 |
ANALYSIS OF CHARACTERISTICS AND PARKING NEEDS OF SYIFA MEDIKA GENERAL HOSPITAL BANJARBARU |
Abstract
|
Wahyudin Wahyudin, Muhammad Arsyad |
|
Vol 6, No 5 (2022): CERUCUK, VOL 6. NO. 5 MAY 2022 |
ANALYSIS OF CLEAN WATER NEEDS IN WEST BANJARMASIN DISTRICT |
Abstract
PDF
|
Tantowi Effendy |
|
Vol 6, No 4 (2022): CERUCUK, VOL 6. NO. 4 APRIL 2022 |
ANALYSIS OF COST AND TIME CONTROL WITH EARNED VALUE METHOD USING MICROSOFT PROJECT 2010 (CASE STUDY: RIVER NORMALIZATION AND DRYDRYING WORKS SPREAD IN THE CITY OF BANJARMASIN (MUARA SUNGAI BUAYA)) |
Abstract
PDF
|
Muhammad Suharto, Eliatun Eliatun |
|
Vol 5, No 2 (2021): CERUCUK VOL. 5 NO. 2 FEBRUARY 2021 |
ANALYSIS OF DELAY ENTRY AND PLANNING OF PARKING GATES QMALL BANJARBARU |
Abstract
PDF
|
Ali Charoenplien, Puguh Budi Prakoso |
|
Vol 6, No 3 (2022): CERUCUK VOL. 6 NO. 3 MARCH 2022 |
ANALYSIS OF DROUGHT INDEX IN THE GAMBUT SUB-DISTRICT, SOUTH BORNEO, FOR WILDFIRE PEATLAND MITIGATION |
Abstract
PDF
|
Rizka Ananda Putri, Novitasari Novitasari |
|
Vol 7, No 2 (2023): CERUCUK VOL. 7 NO. 2 FEBRUARY 2023 |
ANALYSIS OF EFFECT WATER REDUCTION AND ABRASION VALUE OF COARSE AGGREGATE PADA BETON BY USING SUPERPLASTICIZER VISCOCRETE 1050 HE |
Abstract
PDF
|
Krisna Varian Ardhika Prambudi, Irfan Prasetia |
|
Vol 6, No 2 (2022): CERUCUK VOL. 6 NO. 2 FEBRUARY 2022 |
ANALYSIS OF FLEXIBLE PAVEMENT THICKNESS AT THE 3 NORTH RING ROAD JUNCTION- 3 GOLF ROAD-KASTURI ROAD IN BANJARBARU CITY |
Abstract
PDF
|
M. Riswandi, Yasruddin Yasruddin |
|
Vol 7, No 5 (2023): CERUCUK, VOL. 7 NO. 5 MAY 2023 |
Analysis Of Flood Discharge Plan with The Der Weduwen Method in Area of Campus I Banjarmasin of Lambung Mangkurat University |
Abstract
PDF
|
Maulidya Putri Sutanti, Maya Amalia, Elma Sofia |
|
Vol 8, No 7 (2024): CERUCUK VOL 8 NO. 7 JULY 2024 |
ANALYSIS OF MARSHALL CHARACTERISTICS WITH FLY ASH MATERIAL ON STONE DUST SUBSTITUTION AS FILLER IN HRS-WC MIXTURE |
Abstract
PDF
|
Feronia Azcharyah, Utami Sylvia Lestari, Yasruddin Yasruddin |
|
Vol 1, No 3 (2017): CERUCUK VOL. 1 NO. 3 MARCH 2017 |
ANALYSIS OF NEGARA RIVER SEDIMENTATION AND PREDICTION OF DAMAGE ON ANDI TAJANG BRIDGE IN HULU SUNGAI SELATAN REGENCY |
Abstract
PDF
|
Andrean R. Juanizar, M. Azhari Noor, Nilna Amal |
|
Vol 7, No 3 (2023): CERUCUK, VOL. 7 NO. 3 MARCH 2023 |
ANALYSIS OF PARKING SPACE REQUIREMENTS IN PLANNED AREA 3 (KELAYAN PARK) WEST KELAYAN BANJARMASIN |
Abstract
PDF
|
Ayra Faza Rusyda, Muhammad Arsyad |
|
Vol 7, No 4 (2023): CERUCUK, VOL. 7 NO. 4 APRIL 2023 |
ANALYSIS OF PAVEMENT THICKNESS OF ROAD REHABILITATION PROJECT SP. LIANG ANGGANG –CITY BOUNDARY OF PELAIHARI SECTION 1 (STA. 3+700 - STA. 7+300) CITY OF BANJARBARU |
Abstract
PDF
|
Endang Sulistyani, Yasruddin Yasruddin |
|
Vol 7, No 7 (2023): CERUCUK, VOL. 7 NO. 7 JULY 2023 |
ANALYSIS OF ROAD DAMAGE CONDITION USING THE PAVEMENT CONDITION INDEX (PCI) METHOD ON THE ROAD SEGMENT OF GUBERNUR SARKAWI, BARITO KUALA REGENCY (STA 4+000 – 9+000) |
Abstract
PDF
|
Muhammad Alvin Rachim, Muhammad Arsyad |
|
Vol 7, No 1 (2023): CERUCUK VOL. 7 NO. 1 JANUARY 2023 |
ANALYSIS OF SCHEDULING USING CPM AND PDM METHODS WITH MICROSOFT PROJECT 2019 IN THE REPLACEMENT PROJECT OF SALIM RIVER BRIDGE MATARAMAN |
Abstract
PDF
|
Della Ayu Safitri, Henry Wardhana |
|
Vol 6, No 3 (2022): CERUCUK VOL. 6 NO. 3 MARCH 2022 |
ANALYSIS OF SHALLOW GROUND WATER CAPACITY TESTING WITH PUMPING TEST METHOD |
Abstract
PDF
|
Noor Irma Rizki, Noordiah Helda |
|
Vol 6, No 3 (2022): CERUCUK VOL. 6 NO. 3 MARCH 2022 |
ANALYSIS OF T JUNCTION ON PRAMUKA STREET – DHARMA BUDI STREET, BANJARMASIN CITY |
Abstract
PDF
|
Muhammad Nur Akbar, Iphan Fitrian Radam |
|
Vol 8, No 2 (2024): CERUCUK VOL. 8 NO. 2 FEBRUARY 2024 |
Analysis of the Budget Plan (RAB) with the Concept of Building Information Modeling (BIM) in the Banjarbaru At-Taqwa Mosque Development Project |
Abstract
PDF
|
Agung Motik Pratikno, Husnul Khatimi |
|
Vol 6, No 2 (2022): CERUCUK VOL. 6 NO. 2 FEBRUARY 2022 |
ANALYSIS OF THE CHARACTERISTICS AND PARKING NEEDS OF PARINGIN MARKET, BALANGAN REGENCY |
Abstract
PDF
|
Egga Yosana, Muhammad Arsyad |
|
Vol 8, No 5 (2024): CERUCUK VOL 8 NO. 5 MAY 2024 |
ANALYSIS OF THE CHARACTERISTICS AND PARKING NEEDS OF RATU ZALECHA GENERAL HOSPITAL |
Abstract
|
M D Azzana, Muhammad Arsyad |
|
Vol 7, No 3 (2023): CERUCUK, VOL. 7 NO. 3 MARCH 2023 |
ANALYSIS OF THE CHARACTERISTICS AND REQUIREMENT OF PARKING AREAS AT KUBAH DATU KALAMPAYAN TERMINAL ASTAMBUL DISTRICT, SOUTH KALIMANTAN |
Abstract
PDF
|
Nor Astika, Muhammad Arsyad |
|
Vol 7, No 7 (2023): CERUCUK, VOL. 7 NO. 7 JULY 2023 |
ANALYSIS OF THE EFFECT OF PARKING ON THE STREET AGENCY ON THE PERFORMANCE OF THE BANJARMASIN VETERAN ROAD |
Abstract
PDF
|
Ahmad Naufal Adriannoor, Iphan Fitrian Radam |
|
1 - 25 of 149 Items |
1 2 3 4 5 6 > >> |