| Issue | Title | |
| Vol 10, No 8 (2026): CERUCUK VOL. 10 NO. 8 AUGUST 2026 | OPTIMIZATION OF LINK LENGTH AND PLACEMENT OF ECCENTRICALLY BRACED FRAME (EBF) TO ENHANCE STRUCTURAL RESPONSE IN A 12-STORY STEEL BUILDING | Abstract PDF |
| Muhammad Indra Setiadi, Ade Yuniati Pratiwi | ||
| Vol 10, No 8 (2026): CERUCUK VOL. 10 NO. 8 AUGUST 2026 | OPTIMIZATION OF OPTIMUM BITUMEN CONTENT AND MARSHALL CHARACTERISTICS OF AC-WC MIXTURES WITH RESIN GUM ADDITIVE | Abstract PDF |
| Muhammad 'Illiyyin Lathif Malik, Yasruddin Yasruddin, Badaruddin Mu'min | ||
| Vol 10, No 6 (2026): CERUCUK VOL. 10 NO. 6 JUNE 2026 | OPTIMIZING CANAL BLOCK DESIGN AS AN EFFORT TO REWETTING PEATLANDS IN PULANG PISAU DISTRICT | Abstract PDF |
| Marliah Marliah, Novitasari Novitasari | ||
| Vol 6, No 4 (2022): CERUCUK, VOL 6. NO. 4 APRIL 2022 | OVERVIEW OF THE MECHANICAL PROPERTIES OF HIGH FLOWABILITY CONCRETE USING LADUNG ANDESITE STONE WITH SUPERPLASTICIZER | Abstract PDF |
| Muhammad Syarif Syahputera, Nursiah Chairunnisa | ||
| Vol 7, No 7 (2023): CERUCUK, VOL. 7 NO. 7 JULY 2023 | PARAMETER ANALYSIS OF PILE BEARING CAPACITY BASED ON LOADING TEST AND NUMERICAL METHODS | Abstract PDF |
| Made Intan Nursabrina, Yulian Firmana Arifin | ||
| Vol 10, No 2 (2026): CERUCUK VOL. 10 NO. 2 FEBRUARY 2026 | PERFORMANCE ANALYSIS AT THE SIGNALED INTERSECTION OF PATIH RUMBIH ROAD - JAVA ROAD - KERUING ROAD, KAPUAS REGENCY | Abstract PDF |
| Eki Masardika, Nova Widayanti | ||
| Vol 10, No 1 (2026): CERUCUK VOL. 10 NO. 1 JANUARY 2026 | PERFORMANCE ANALYSIS OF INTERSECTION AND NOISE LEVEL AT IR. PH. MOCH. NOOR GURU DANAU INTERSECTION, TANJUNG DISTRICT, TABALONG REGENCY | Abstract PDF |
| Rizki Gilang Ramadhan, Badaruddin Mu’min | ||
| Vol 8, No 3 (2024): CERUCUK, VOL 8. NO. 3 MARCH 2024 | PERFORMANCE ANALYSIS OF JEND AHMAD YANI ROAD KM.7 BANJAR REGENCY DUE TO MARKET ACTIVITIES | Abstract PDF |
| Andhika Surya Saputera, Puguh Budi Prakoso | ||
| Vol 10, No 5 (2026): CERUCUK VOL. 10 NO. 5 MAY 2026 | PERFORMANCE ANALYSIS OF SIMPANG EMPAT ROUNDABOUT IN BANJARBARU CITY | Abstract PDF |
| Agustina Wulandari, Nova Widayanti | ||
| Vol 8, No 6 (2024): CERUCUK VOL 8 NO. 6 JUNE 2024 | PERFORMANCE ANALYSIS OF STREET AHMAD YANI KM 27 DUE TO THE SP. ROAD REHABILITATION WORK PROJECT. LIANG ANGGANG - BTS. TRAINING CITY SECTION 1 BANJARBARU CITY | Abstract PDF |
| M. Ikhsan Khalikinor, Yasruddin Yasruddin | ||
| Vol 6, No 6 (2022): CERUCUK, VOL 6. NO. 6 JUNE 2022 | PERFORMANCE ANALYSIS OF T JUNCTION ON SMP 3 STREET – SEKUMPUL UJUNG STREET IN MARTAPURA CITY | Abstract PDF |
| Ryend Pratama Syah, Iphan Fitrian Radam | ||
| Vol 10, No 4 (2026): CERUCUK VOL. 10 NO. 4 APRIL 2026 | PERFORMANCE ANALYSIS OF THE INTERSECTION OF FOUR VETERAN ROADS, MARABAHAN DISTRICT, BARITO KUALA REGENCY | Abstract PDF |
| Anita Fitriani, Nova Widayanti, Nada Salsabila | ||
| Vol 10, No 6 (2026): CERUCUK VOL. 10 NO. 6 JUNE 2026 | PERFORMANCE ANALYSIS OF THE SANTA LAZARUS MULTIPURPOSE BUILDING CONSTRUCTION PROJECT USING EARNED VALUE MANAGEMENT (EVM) | Abstract PDF |
| Nisa Febriyanti, Eliatun Eliatun | ||
| Vol 1, No 1 (2017): CERUCUK VOL. 1 NO. 1 JANUARI 2017 | PERFORMANCE ANALYSIS OF TRAFFIC FLOW USING GREENSHIELDS, GREENBERGH, AND UNDERWOOD METHODS ON AHMAD YANI KM 40 MARTAPURA ROAD | Abstract PDF |
| Cathleen Ariela T S, Rosehan Anwar | ||
| Vol 4, No 1 (2020): CERUCUK VOL. 4 NO. 1 JAN 2020 | PERFORMANCE ANALYSIS OF UNSIGNALIZED INTERSECTION ON PERJUANGAN AND VETERAN STREET MARTAPURA BANJAR DISTRICT | Abstract PDF |
| Achmad Fajar, Yasruddin Yasruddin | ||
| Vol 1, No 1 (2017): CERUCUK VOL. 1 NO. 1 JANUARI 2017 | PERFORMANCE ANALYSIS OF URBAN ROADS JALAN A. YANI KM. 34, BANJARBARU | Abstract PDF |
| Idham Kholid, Rosehan Anwar | ||
| Vol 7, No 6 (2023): CERUCUK, VOL. 7 NO. 6 JUNE 2023 | PERFORMANCE ANALYSIS TUGU KETUPAT KANDANGAN II ROUNDABOUT | Abstract PDF |
| Majdina Nurin, Muhammad Arsyad | ||
| Vol 8, No 5 (2024): CERUCUK VOL 8 NO. 5 MAY 2024 | Pileslab Design in Pabaungan Hilir, Candi Laras Selatan District, Tapin Regency, South Kalimantan | Abstract |
| Rif’at Syahdana, Yulian Firmana Arifin | ||
| Vol 7, No 5 (2023): CERUCUK, VOL. 7 NO. 5 MAY 2023 | Planning Cash Flow Payment Systems Progress per 25% EST and LST Conditions in the State Court Office Building Project, Balangan Regency | Abstract PDF |
| Ahmad Zidni Muzandry, Henry Wardhana | ||
| Vol 5, No 1 (2021): CERUCUK VOL. 5 NO. 1 JANUARY 2021 | PLANNING EVALUATION OF RIGID PAVEMENT’S THICKNESS ON INTERSECTION OF A ROAD SEGMENT OF SIKUI KM. 34 NATIONAL ROAD STA. 0+000 S/D 0+300 EAST BARITO DISTRICT | Abstract PDF |
| Agung Rubian Dwi Putra, Yasruddin Yasruddin | ||
| Vol 1, No 3 (2017): CERUCUK VOL. 1 NO. 3 MARCH 2017 | PLANNING IMPLEMENTATION OF TIME ON REPEATING PROJECT WITH LINE OF BALANCE METHOD | Abstract PDF |
| Cindy A. Usyor, Henry Wardhana | ||
| Vol 9, No 6 (2025): CERUCUK VOL. 9 NO. 6 JUNE 2025 | PLANNING OF RIVER FLOW CONTROL AND LANDSLIDE CONTROL BUILDINGS IN WALET VILLAGE, NORTH BARITO REGENCY | Abstract PDF |
| Nurhaliza Febriyani, Hutagamissufardal Hutagamissufardal | ||
| Vol 5, No 1 (2021): CERUCUK VOL. 5 NO. 1 JANUARY 2021 | PLANNING TO REPAIR THE APPROACH SLABS BRIDGE MUARA TABIRAI, RANTAU – KANDANGAN | Abstract PDF |
| Ade Nafis Prawira | ||
| Vol 7, No 4 (2023): CERUCUK, VOL. 7 NO. 4 APRIL 2023 | PRODUCTIVITY ANALYSIS OF HEAVY EQUIPMENT WORKING TIME ON THE ROAD PRESERVATION PROJECT OF RANTAU-KANDANGAN-DS. BAGAMBIR–HAMBAWANG BEACH–MANTIMIN–PARINGIN | Abstract PDF |
| Maulida Zahra, Candra Yuliana | ||
| Vol 10, No 4 (2026): CERUCUK VOL. 10 NO. 4 APRIL 2026 | PUSHOVER ANALYSIS ON A MOSQUE BUILDING STRUCTURE WITH A TIERED ROOF SLAB | Abstract PDF |
| Naek Rizki Pandiangan, Ade Yuniati Pratiwi | ||
| 126 - 150 of 222 Items | << < 1 2 3 4 5 6 7 8 9 > >> | |


