| Issue | Title | |
| Vol 8, No 2 (2024): CERUCUK VOL. 8 NO. 2 FEBRUARY 2024 | RE-ESTIMATION OF GUNTUNG PAYUNG BANJARBARU COMMUNITY HEALTH CENTER BUILDING PROJECT USING BIM SYSTEM (BUILDING INFORMATION MODELING) BASED COST ESTIMATION | Abstract PDF |
| Ibnu Fathonah | ||
| Vol 9, No 5 (2025): CERUCUK VOL. 9 NO. 5 MAY 2025 | RESCHEDULING OF THE CONSTRUCTION PROJECT OF THE SYEKH MUHAMMAD ARSYAD AL-BANJARI MOSQUE USING THE FAST TRACK METHOD | Abstract PDF |
| Dwi Rahmawati Rahayu, Eliatun Eliatun | ||
| Vol 10, No 7 (2026): CERUCUK VOL. 10 NO. 7 JULY 2026 | Rescheduling of the UNKRIP Student Dormitory Building Project Based on 4D BIM | Abstract PDF |
| Muhammad Aiman Habibie, Irfan Prasetia | ||
| Vol 10, No 8 (2026): CERUCUK VOL. 10 NO. 8 AUGUST 2026 | RESCHEDULING STUDY OF THE BATU HARANG BRIDGE CONSTRUCTION PROJECT | Abstract PDF |
| Putri Aprilia Rahmi, Eliatun Eliatun | ||
| Vol 7, No 1 (2023): CERUCUK VOL. 7 NO. 1 JANUARY 2023 | RESCHEDULING USING THE PDM METHOD WITH MICROSOFT PROJECT 2021 IN THE URBAN SLUM QUALITY IMPROVEMENT PROJECT FOR AIR SANTRI, BANJAR REGENCY | Abstract PDF |
| Naura Rasyida Nurcahya, Candra Yuliana, Endah Widiastuti | ||
| Vol 1, No 2 (2017): CERUCUK VOL. 1 NO. 2 FEBRUARI 2017 | RIGID PAVEMENT DESIGN NATIONAL ROAD REGION II SOUTH KALIMANTAN PROVINCE SIMPANG HANDIL BAKTI-MARABAHAN ROAD (KM 11+350 - KM 16+350) REGENCY OF BARITO KUALA | Abstract PDF |
| Siti Muliani, Yasruddin Yasruddin | ||
| Vol 9, No 2 (2025): CERUCUK VOL. 9 NO. 2 FEBRUARY 2025 | Risk Analysis in the Implementation of Phase II Development Project of the South Kalimantan Provincial Social Service Office | Abstract PDF |
| Athafa'iq Mufadhadal Noor, Abdul Karim | ||
| Vol 10, No 6 (2026): CERUCUK VOL. 10 NO. 6 JUNE 2026 | RISK ANALYSIS IN THE IMPLEMENTATION OF THE GUNUNG PAMATON – GUNUNG COKLAT ROAD CONSTRUCTION PROJECT, BANJAR REGENCY, SOUTH KALIMANTAN | Abstract PDF |
| Muhammad Imam Qolyubi, Candra Yuliana, Aulia Isramaulana | ||
| Vol 9, No 3 (2025): CERUCUK VOL. 9 NO. 3 MARCH 2025 | RISK ANALYSIS ON THE CONSTRUCTION PROJECT OF THE SOUTH KALIMANTAN REGIONAL PEOPLE'S REPRESENTATIVE COUNCIL (DPRD) BUILDING | Abstract PDF |
| Herni Ramadaayanti, Candra Yuliana, Aulia Isramaulana | ||
| Vol 9, No 2 (2025): CERUCUK VOL. 9 NO. 2 FEBRUARY 2025 | RISK ANALYSIS ON THE IMPLEMENTATION OF THE CONSTRUCTION PROJECT OF THE HIGH PROSECUTOR'S OFFICE OF SOUTH KALIMANTAN PROVINCE (CONTINUED) | Abstract PDF PDF |
| Irwina Sari Verdiyani, Abdul Karim, Muhammad Alfian Noor | ||
| Vol 9, No 1 (2025): CERUCUK VOL. 9 NO. 1 JANUARY 2025 | Risk Analysis on the Pejambuan Village Bridge Construction Project, Sungai Tabuk District, Banjar Regency, South Kalimantan | Abstract PDF |
| Ni'matul Khalishah, Abdul Karim, Retna Hapsari Kartadipura | ||
| Vol 1, No 3 (2017): CERUCUK VOL. 1 NO. 3 MARCH 2017 | RIVER CAPACITY ANALYSIS AFFECTED BY THE TIDE | Abstract PDF |
| Akhmad Taruna Rasyidi, Maya Amalia, M. Azhari Noor | ||
| Vol 8, No 6 (2024): CERUCUK VOL 8 NO. 6 JUNE 2024 | ROAD DRAINAGE SYSTEM DESIGN EVALUATION (CASE STUDY OF PRAMUKA ROAD, BANJARBARU CITY) | Abstract PDF |
| Firstyarinda Poppy Secondhanti, Ulfa Fitriati | ||
| Vol 4, No 1 (2020): CERUCUK VOL. 4 NO. 1 JAN 2020 | ROAD PERFORMANCE ANALYSIS WITH MEDIAN AND WITHOUT MEDIAN ON THE ROAD OF A.YANI SATUI | Abstract PDF |
| Abdy Herwandy | ||
| Vol 9, No 1 (2025): CERUCUK VOL. 9 NO. 1 JANUARY 2025 | SCHEDULING ANALYSIS OF PLAN, REALISATION, AND ESTIMATION BY USING PRECEDENCE DIAGRAM METHOD (PDM) (CASE STUDY : CONSTRUCTION DEVELOPMENT PROJECT MULTI-PURPOSE SPORTS HALL PHASE IV IN KATINGAN REGENCY) | Abstract PDF |
| Dhika Fitrianita Putri, Endah Widiastuti, Humaira Afrila, Gawit Hidayat | ||
| Vol 10, No 3 (2026): CERUCUK VOL. 10 NO. 3 MARCH 2026 | SCHEDULING ANALYSIS USING THE PDM METHOD IN THE SYAMSUDIN NOOR AIRPORT ACCESS ROAD CONSTRUCTION PROJECT WITH THE HELP OF MICROSOFT PROJECT | Abstract PDF |
| Nurisma Witami, Husnul Khatimi | ||
| Vol 9, No 2 (2025): CERUCUK VOL. 9 NO. 2 FEBRUARY 2025 | SCHEDULING ANALYSIS USING THE PRECEDENCE DIAGRAM METHOD (PDM) METHOD IN THE PHASE II BRIDGE CONSTRUCTION PROJECT IN PEJAMBUAN VILLAGE, SUNGAI TABUK DISTRICT, BANJAR REGENCY, SOUTH KALIMANTAN | Abstract PDF |
| Alfisyah Oktarina Pinanggi, Abdul Karim, Endah Widiastuti | ||
| Vol 9, No 5 (2025): CERUCUK VOL. 9 NO. 5 MAY 2025 | SCHEDULING STUDY USING PRECEDENCE DIAGRAM METHOD (PDM) IN THE IMPLEMENTATION OF THE SOUTH KALIMANTAN PROVINCIAL SOCIAL SERVICE DEVELOPMENT PROJECT PHASE-II | Abstract PDF |
| Nabila Azzahra, Abdul Karim | ||
| Vol 10, No 2 (2026): CERUCUK VOL. 10 NO. 2 FEBRUARY 2026 | SCHEDULING STUDY USING THE PDM METHOD IN THE CONSTRUCTION PROJECT OF JALAN SIMPANG 4 ISLAMIC CENTER – TANJUNG SELATAN WITH THE HELP OF PROJECT 2019 | Abstract PDF |
| Mutiara Sari, Husnul Khatimi | ||
| Vol 10, No 7 (2026): CERUCUK VOL. 10 NO. 7 JULY 2026 | SCHEDULING STUDY USING THE PDM METHOD IN THE PIANGGU-LALAP ROAD RECONSTRUCTION PROJECT (SUPPORTING THE FOOD ESTATE - DAK) IN AWANG DISTRICT, EAST BARITO REGENCY, CENTRAL KALIMANTAN | Abstract PDF |
| Rika Sapitri, Eliatun Eliatun | ||
| Vol 6, No 3 (2022): CERUCUK VOL. 6 NO. 3 MARCH 2022 | SECONDARY CHANNEL PLANNING TECHNICAL ANALYSIS BATANG ALAI, BARABAI, SOUTH KALIMANTAN | Abstract PDF |
| Riza Ilhami | ||
| Vol 6, No 6 (2022): CERUCUK, VOL 6. NO. 6 JUNE 2022 | SHALLOW GROUNDWATER IN CONSUMPTION STUDY IN TAMBANG ULANG DISTRICT REGENCY OF TANAH LAUT | Abstract PDF |
| Sa’ud Lukman Hakim, Ulfa Fitriati | ||
| Vol 2, No 1 (2018): CERUCUK VOL. 2 NO. 1 JANUARy 2018 | SHEET PILE CONSTRUCTION DESIGN AS AN ALTERNATIVE TREATMENT FOR LANDSLIDE ON THE CITY BOUNDARY’S ROADS SECTIONS OF TANAH GROGOT-LOLO KUARO, TANAH GROGOT DISTRICT, PASER REGENCY, TANA PASER | Abstract PDF |
| Cindy Nitasari, Markawie Markawie | ||
| Vol 2, No 1 (2018): CERUCUK VOL. 2 NO. 1 JANUARy 2018 | SLOPE HANDLING DESIGN PIHANIN BRIDGE PANDAN SARI VILLAGE HULU SUNGAI SELATAN REGENCY | Abstract PDF |
| Markawie Markawie, Achmad Abdurrahman | ||
| Vol 9, No 6 (2025): CERUCUK VOL. 9 NO. 6 JUNE 2025 | Slope Stability Review Using Soil Nailing Reinforcement in the Construction Project of Underpass Km. 101 Tatakan | Abstract PDF PDF |
| Langgeng Andriansyah, Rusdiansyah Rusdiansyah, Nada Salsabila, Muhammad Alfian Noor | ||
| 151 - 175 of 222 Items | << < 2 3 4 5 6 7 8 9 > >> | |


