Page Header

Open Journal Systems

Flag Counter

Journal Help
User
Notifications
  • View
  • Subscribe
Language
Journal Content

Browse
  • By Issue
  • By Author
  • By Title
  • Other Journals
Font Size

Information
  • For Readers
  • For Authors
  • For Librarians
  • Home
  • About
  • Login
  • Search
  • Current
  • Archives
  • Announcements
Home > Archives > Vol 10, No 7 (2026)

Vol 10, No 7 (2026)

CERUCUK VOL. 10 NO. 7 JULY 2026

DOI: https://doi.org/10.20527/crc.v10i7

Table of Contents

Articles

Rescheduling of the UNKRIP Student Dormitory Building Project Based on 4D BIM
Muhammad Aiman Habibie, Irfan Prasetia
PDF
326-333
SCHEDULING STUDY USING THE PDM METHOD IN THE PIANGGU-LALAP ROAD RECONSTRUCTION PROJECT (SUPPORTING THE FOOD ESTATE - DAK) IN AWANG DISTRICT, EAST BARITO REGENCY, CENTRAL KALIMANTAN
Rika Sapitri, Eliatun Eliatun
PDF
334-341
COMPARATIVE STUDY OF DESIGN VARIATIONS OF SIZES AND POSITIONS OF OPENINGS IN SHEARWALLS FOR HOTEL BUILDINGS ON SOFT LAND
Cariani Sinaga, Ade Yuniati Pratiwi
PDF
342-351
Linear Analysis for Performance Evaluation of Twin Suspension Bridge's Upper Structure (Case Study: Barito Bridge, Barito Kuala Regency)
Kamil Al Kahfi Sobina, Ade Yuniati Pratiwi
PDF
352-359
DESIGN OF RETAINING WALLS FOR LANDSLIDE MITIGATION ON THE BULONTIO—TOLINGGULA ROAD SEGMENT, NORTH GORONTALO REGENCY, GORONTALO PROVINCE
Rikyanoor Ramadhana, Rusdiansyah Rusdiansyah
PDF
360-369


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License. 

joomla
statistics View My Stats

Indexed By:

 

GOOGLE SCHOLAR : Kutipan = 2, H-index = 1, i10-index = 0