| Issue | Title | |
| Vol 8, No 5 (2024): CERUCUK VOL 8 NO. 5 MAY 2024 | EVALUATION OF DRAINAGE SYSTEM IN CEMAKA SLUM IN FLOOD EVENTS IN 2021 | Abstract PDF |
| Zolecha Ayu Nadela, Novitasari Novitasari | ||
| Vol 7, No 3 (2023): CERUCUK, VOL. 7 NO. 3 MARCH 2023 | EVALUATION OF FACTORS CAUSING DELAYS IN ROAD RECONSTRUCTION PROJECTS AND PLANNING COST AND TIME CONTROL (Case Study Of Reconstruction Project / Capacity Building Of Road Structures: Cabi-Bumi Rata R.074 Dak Regular Simpang Empat District, Banjar Regency) | Abstract PDF |
| Yoga Langgeng Yuana, Henry Wardhana | ||
| Vol 8, No 4 (2024): CERUCUK VOL 8 NO. 4 APRIL 2024 | Evaluation of Infiltrated Water Volume in the Liang Anggang Protected Forest Block 1 | Abstract PDF |
| M Aulia Ramadhani, Novitasari Novitasari | ||
| Vol 7, No 1 (2023): CERUCUK VOL. 7 NO. 1 JANUARY 2023 | EVALUATION OF KM-4 CONCRETE PAVEMENT THICKNESS, LEMO VILLAGE ACROSS NORTH BARITO REGENCY | Abstract PDF |
| Sonia Fatimah, Yasruddin Yasruddin, Nova Widayanti | ||
| Vol 5, No 2 (2021): CERUCUK VOL. 5 NO. 2 FEBRUARY 2021 | EVALUATION OF PARKING SPACES AT THE CLEANERS | Abstract PDF |
| Aldo Manggaranap Lumban Tobing | ||
| Vol 7, No 6 (2023): CERUCUK, VOL. 7 NO. 6 JUNE 2023 | EVALUATION OF POTENTIAL UTILIZATION OF SEA SAND IN LONTAR VILLAGE, KOTABARU REGENCY AS FINE AGGREGATE IN CONCRETE | Abstract PDF |
| Muhammad Taufik, Ratni Nurwidayati | ||
| Vol 8, No 4 (2024): CERUCUK VOL 8 NO. 4 APRIL 2024 | EVALUATION OF THE VOLUME OF INFILTRATED WATER IN THE UPSTREAM OF THE CEMPAKA RETENTION BASIN IN BANJARBARU CITY | Abstract PDF |
| Muhammad Zakaria Anshari, Novitasari Novitasari | ||
| Vol 9, No 5 (2025): CERUCUK VOL. 9 NO. 5 MAY 2025 | EVALUATION STUDY OF THE CONSTRUCTION SCHEDULE OF THE GUNUNG KUPANG RESERVOIR WITH ADDITIONAL WORKING HOURS USING THE CRASHING METHOD | Abstract PDF |
| Muhammad Aulia Rahman, Eliatun Eliatun | ||
| Vol 10, No 6 (2026): CERUCUK VOL. 10 NO. 6 JUNE 2026 | FIVE-STOREY BUILDING FOUNDATION PLANNING : BANJARMASIN CUSTOMS REGIONAL OFFICE | Abstract PDF |
| Mohammad Atilla Nomka Putra, Hutagamissufardal Hutagamissufardal | ||
| Vol 7, No 7 (2023): CERUCUK, VOL. 7 NO. 7 JULY 2023 | Geometric Evaluation of Roads on the Gunung Batu Road Section of Tapin Regency (STA 0 +000 – 1+451) | Abstract PDF |
| M. Saufi, Puguh Budi Prakoso | ||
| Vol 10, No 2 (2026): CERUCUK VOL. 10 NO. 2 FEBRUARY 2026 | GEOMETRIC PLANNING AND THICK PAVEMENT ON ALTERNATIVE ROAD KM 171 TANAH BUMBU REGENCY | Abstract PDF |
| Mariatul Karimah, Puguh Budi Prakoso | ||
| Vol 1, No 3 (2017): CERUCUK VOL. 1 NO. 3 MARCH 2017 | GROIN DESIGN AS A COASTAL PROTECTION PAGATAN BEACH, TANAH BUMBU REGENCY | Abstract PDF |
| Holdani Kurdi, Helmy Kurnia, Novitasari Novitasari | ||
| Vol 4, No 1 (2020): CERUCUK VOL. 4 NO. 1 JAN 2020 | HYDROLOGICAL ASPECT OF BATANG ALAI WEIR WATERSHED DUE TO LAND USE CHANGES INTO MINING AREAS | Abstract PDF |
| Achmad Surian Nur, M. Azhari Noor | ||
| Vol 6, No 1 (2022): CERUCUK VOL. 6 NO. 1 JANUARY 2022 | IMPLEMENTATION OF 4D BUILDING INFORMATION MODELING (BIM) ON THE FLAT BUILDING PROJECT OF BBPJN XI/PJN I KALIMANTAN | Abstract PDF |
| Akhmad Hafizurahman, Husnul Khatimi | ||
| Vol 6, No 2 (2022): CERUCUK VOL. 6 NO. 2 FEBRUARY 2022 | IMPLEMENTATION OF 4D BUILDING INFORMATION MODELING (BIM) USING TEKLA STRUCTURES | Abstract PDF |
| Kristnanda Floter Pardosi, Husnul Khatimi | ||
| Vol 6, No 5 (2022): CERUCUK, VOL 6. NO. 5 MAY 2022 | IMPLEMENTATION OF BUILDING INFORMATION MODELING (BIM) ON THE USHULUDIN BUILDING CONSTRUCTION PROJECT CAMPUS 2 UIN ANTASARI BANJARBARU | Abstract PDF |
| Putu Pranangga Widyastana, Husnul Khatimi | ||
| Vol 8, No 3 (2024): CERUCUK, VOL 8. NO. 3 MARCH 2024 | INTEGRATED LABORATORY BUILDING FOUNDATION DESIGN OF LAMBUNG MANGKURAT UNIVERSITY IN BANJARBARU | Abstract PDF |
| Syarif Abdillah Malik, Rusliansyah Rusliansyah, Muhammad Afief Ma’ruf | ||
| Vol 10, No 8 (2026): CERUCUK VOL. 10 NO. 8 AUGUST 2026 | INTEGRATED LABORATORY BUILDING FOUNDATION DESIGN OF LAMBUNG MANGKURAT UNIVERSITY IN BANJARBARU | Abstract PDF |
| Syarif Abdillah Malik, Rusliansyah Rusliansyah, Muhammad Afief Ma’ruf | ||
| Vol 3, No 1 (2019): CERUCUK VOL. 3 NO. 1 JANUARY 2019 | INVENTORY THE CHARACTERISTICS OF THE RIVER VETERAN BANJARMASIN CITY FROM TEMPEKONG (STA 0+000) UNTIL THE MARKET KURIPAN(STA 1+219) | Abstract PDF |
| Al-Harisnor Al-Harisnor, Maya Amalia, M. Azhari Noor | ||
| Vol 6, No 9 (2022): CERUCUK VOL. 6 NO. 9 SEPTEMBER 2022 | KBDI Analysis of Peatland Drought Index Modification in Liang Anggang Protected Forest Area Block 1 | Abstract PDF |
| Aditya Dyastawan, Novitasari Novitasari | ||
| Vol 8, No 1 (2024): CERUCUK VOL. 8 NO. 1 JANUARY 2024 | LEVEL OF WORKABILITY AND MECHANICAL BEHAVIOR OF FLOW CONCRETE WITH FLY ASH UTILIZATION WITH VISCOCRETE 1050 HE | Abstract PDF |
| Ridho Riyandi | ||
| Vol 10, No 7 (2026): CERUCUK VOL. 10 NO. 7 JULY 2026 | Linear Analysis for Performance Evaluation of Twin Suspension Bridge's Upper Structure (Case Study: Barito Bridge, Barito Kuala Regency) | Abstract PDF |
| Kamil Al Kahfi Sobina, Ade Yuniati Pratiwi | ||
| Vol 6, No 1 (2022): CERUCUK VOL. 6 NO. 1 JANUARY 2022 | MARSHALL CHARACTERISTICS ANALYSIS USING VARIATION WITHOUT BROKEN AND MANY FRACTURES OF GRAVEL ON MIXED HOT ROLLED SHEET - WEARING COURSE (HRS-WC) | Abstract PDF |
| Dela Permata Sari, Yasrudin Yasrudin | ||
| Vol 7, No 1 (2023): CERUCUK VOL. 7 NO. 1 JANUARY 2023 | MATERIAL MANAGEMENT SYSTEM ON NARROW LAND IN THE TOTAL REHAB PROJECT OF THE NEW PEMURUS HEALTH CENTER | Abstract PDF |
| Muhammad Ferdy Perdana Muchlis, Retna Hapsari Kartadipura, Abdul Karim | ||
| Vol 1, No 1 (2017): CERUCUK VOL. 1 NO. 1 JANUARI 2017 | NOT SIGNALIZED INTERCHANGES ANALYSIS ON EDUCATIONAL PATH-GUNTUNG ALABAN IN MARTAPURA KAB. BANJAR | Abstract PDF |
| Mahdi Noor Erdin, Rosehan Anwar | ||
| 101 - 125 of 222 Items | << < 1 2 3 4 5 6 7 8 9 > >> | |


