| Issue | Title | |
| Vol 9, No 2 (2025): CERUCUK VOL. 9 NO. 2 FEBRUARY 2025 | THE EFFECT OF PILE CROSS-SECTION AREA AND STRAIGHTNESS ON FRICTION CAPACITY IN SOFT CLAY SOIL BASED ON LABORATORY MODEL SCALE | Abstract PDF |
| Muhammad Adam Nur Andhiska, Rusdiansyah Rusdiansyah | ||
| Vol 7, No 8 (2023): CERUCUK, VOL. 7 NO. 8 AUGUST 2023 | THE EFFECT OF QUEUING TRUCKS ON THE ROADSIDE ON ROAD PERFORMANCE ON BRIGJEND HASAN BASRI ROAD BANJARMASIN CITY | Abstract PDF |
| Yulisthio Frananda, Iphan Fitrian Radam | ||
| Vol 10, No 1 (2026): CERUCUK VOL. 10 NO. 1 JANUARY 2026 | THE EFFECT OF SEISMIC ISOLATION SYSTEM TYPE FRICTION PENDULUM SYSTEM (FPS) ON A 12-STOREY APARTMENT HIGHRISE BUILDING IN BANJARMASIN, SOUTH KALIMANTAN | Abstract PDF |
| Muhammad Said Ramadhani, Arya Rizki Darmawan | ||
| Vol 7, No 4 (2023): CERUCUK, VOL. 7 NO. 4 APRIL 2023 | THE EFFECT OF STREET VENDORS ON TRAFFIC CHARACTERISTICS ON-ROAD SECTION WITH TYPE 2/2 UD (CASE STUDY OF JL. JENDRAL SUDIRMAN IN BANJARMASIN) | Abstract PDF |
| Nisvia Febriany, Iphan F. Radam | ||
| Vol 6, No 7 (2022): CERUCUK, VOL 6. NO. 7 JULY 2022 | THE EFFECT OF TRAFFIC LOADS ON PAVEMENT DAMAGE ROAD SEGMENT: ROAD GOVERNOR SARKAWI CITY OF BANJARBARU | Abstract PDF |
| Rosa Phety Permatasari, Utami Sylvia Lestari | ||
| Vol 8, No 4 (2024): CERUCUK VOL 8 NO. 4 APRIL 2024 | The Effect of Water Table and Rainfall on the KBDI Drought Index in the Liang Anggang Protected Forest Area Block 1 | Abstract PDF |
| Nur Nailia, Novitasari Novitasari | ||
| Vol 7, No 2 (2023): CERUCUK VOL. 7 NO. 2 FEBRUARY 2023 | THE RISK ANALYSIS OF OCCUPATIONAL HEALTH AND SAFETY ON THE GIRDER RUKAM HILIR BRIDGE CONSTRUCTION PROJECT | Abstract PDF |
| Annisa Aulia Azmi, Retna Hapsari Kartadipura | ||
| Vol 9, No 1 (2025): CERUCUK VOL. 9 NO. 1 JANUARY 2025 | The Study on the Use of Heavy Equipment Reviewed from Productivity and Cost in the Long Segment Handling Project (Routine Maintenance, Periodic Maintenance, Improvement/Reconstruction) Handil Java - Guava (Dak) | Abstract PDF |
| Nur Aisa Anggraini, Abdul Karim | ||
| Vol 7, No 8 (2023): CERUCUK, VOL. 7 NO. 8 AUGUST 2023 | THE USAGE OF BIM BASED STRUCTURE ANALYSIS APPLICATION TO REDESIGN MITRA KASIH JUNIOR AND SENIOR HIGH SCHOOL BUILDING WITH PRECAST CONCRETE | Abstract PDF |
| Pannadipa Putera Sukmajaya, Husnul Khatimi, Arya Rizki Darmawan | ||
| Vol 2, No 1 (2018): CERUCUK VOL. 2 NO. 1 JANUARy 2018 | THIKCNESS DESIGN OF RIGID PAVEMENT ON THE ROAD SECTION GUBERNUR SUBARJO (STA 6 + 000 S / D STA 11 + 000) BANJARMASIN | Abstract PDF |
| Ibnu Kasfuddin, Yasruddin Yasruddin | ||
| Vol 10, No 5 (2026): CERUCUK VOL. 10 NO. 5 MAY 2026 | TIME AND COST ANALYSIS OF PILE FOUNDATION WORK USING HYDRAULIC STATIC PILE DRIVER (Case Study: Construction Project of the Official Residence of the Governor of South Kalimantan) | Abstract PDF |
| Dhanu Wicaksono, Eliatun Eliatun | ||
| Vol 7, No 3 (2023): CERUCUK, VOL. 7 NO. 3 MARCH 2023 | Time and Cost Analysis of Road Construction Projects Using Earned Value | Abstract PDF |
| Rima Melati, Candra Yuliana | ||
| Vol 10, No 1 (2026): CERUCUK VOL. 10 NO. 1 JANUARY 2026 | TIME AND COST OPTIMIZATION IN LIANG ANGGANG – MARTAPURA – BTS ROAD PRESERVATION PROJECT RANTAU CITY | Abstract PDF |
| Naili Hidayanti, Eliatun Eliatun | ||
| Vol 1, No 2 (2017): CERUCUK VOL. 1 NO. 2 FEBRUARI 2017 | TRAFFIC FLOW ANALYSIS MKJI METHOD AT JALAN TRANS KM 33 KUALA KAPUAS CENTRAL | Abstract PDF |
| Lisa Hardika, Rosehan Anwar | ||
| Vol 6, No 6 (2022): CERUCUK, VOL 6. NO. 6 JUNE 2022 | Traffic Performance Analysis Based on Greenshield, Greenberg and Underwood Modeling on Jalan Raya Batulicin Tanah Bumbu | Abstract PDF |
| Siti Aisyah, Muhammad Arsyad | ||
| Vol 6, No 5 (2022): CERUCUK, VOL 6. NO. 5 MAY 2022 | UPPER AND LOWER STRUCTURE DESIGN OF GRAND GLOBAL HOTEL BANJARMASIN | Abstract PDF |
| Rafa'na Rahman, Rusdiansyah Rusdiansyah | ||
| Vol 1, No 1 (2017): CERUCUK VOL. 1 NO. 1 JANUARI 2017 | UTILIZATION OF BOTTOM ASH AS MATERIAL MIXED SOIL LAYER BASICS IN HIGHWAY CONSTRUCTION | Abstract PDF |
| Muhammad Amir Wardana, Yasruddin Yasruddin | ||
| Vol 1, No 2 (2017): CERUCUK VOL. 1 NO. 2 FEBRUARI 2017 | UTILIZATION OF FLY ASH AS MATERIAL MIXED SOIL LAYER BASICS IN HIGHWAY CONSTRUCTION | Abstract PDF |
| Rina Aulia, Yasruddin Yasruddin | ||
| Vol 6, No 6 (2022): CERUCUK, VOL 6. NO. 6 JUNE 2022 | UTILIZATION OF POROUS INTEGRATION WELL AS AN ALTERNATIVE FOR SURFACE RELEASE CONTROL IN WAREHOUSE COMPLEX | Abstract PDF |
| Rini Safitri, Maya Amalia | ||
| Vol 10, No 3 (2026): CERUCUK VOL. 10 NO. 3 MARCH 2026 | VOLUME ANALYSIS OF NORMALIZATION OF THE TELUK DALAM RIVER IN BANJARMASIN CITY USING HEC-RAS SOFTWARE | Abstract PDF |
| Antung Akhmad Ridhani Khair, Eddy Nashrullah, Novitasari Novitasari | ||
| Vol 3, No 1 (2019): CERUCUK VOL. 3 NO. 1 JANUARY 2019 | WATER SYSTEM OF THE RIVER IN URBAN AREAS THAT AFFECTED BY THE INFLUENCE OF THE TIDES CASE STUDY: TELUK DALAM RIVER IN BANJARMASIN | Abstract PDF |
| Endah Widiastuti, M. Azhari Noor, Maya Amalia | ||
| Vol 6, No 1 (2022): CERUCUK VOL. 6 NO. 1 JANUARY 2022 | WORK ANALYSIS OF HYDRAULIC STATIC PILE DRIVER EQUIPMENT ON PILE FOUNDATION WORK IN TERMS OF TIME AND COST | Abstract PDF |
| Abnu Azhar, Eliatun Eliatun | ||
| 201 - 222 of 222 Items | << < 4 5 6 7 8 9 | |


