|
Issue |
Title |
|
Vol 6, No 1 (2022): CERUCUK VOL. 6 NO. 1 JANUARY 2022 |
IMPLEMENTATION OF 4D BUILDING INFORMATION MODELING (BIM) ON THE FLAT BUILDING PROJECT OF BBPJN XI/PJN I KALIMANTAN |
Abstract
PDF
|
Akhmad Hafizurahman, Husnul Khatimi |
|
Vol 6, No 2 (2022): CERUCUK VOL. 6 NO. 2 FEBRUARY 2022 |
IMPLEMENTATION OF 4D BUILDING INFORMATION MODELING (BIM) USING TEKLA STRUCTURES |
Abstract
PDF
|
Kristnanda Floter Pardosi, Husnul Khatimi |
|
Vol 6, No 5 (2022): CERUCUK, VOL 6. NO. 5 MAY 2022 |
IMPLEMENTATION OF BUILDING INFORMATION MODELING (BIM) ON THE USHULUDIN BUILDING CONSTRUCTION PROJECT CAMPUS 2 UIN ANTASARI BANJARBARU |
Abstract
PDF
|
Putu Pranangga Widyastana, Husnul Khatimi |
|
Vol 8, No 3 (2024): CERUCUK, VOL 8. NO. 3 MARCH 2024 |
INTEGRATED LABORATORY BUILDING FOUNDATION DESIGN OF LAMBUNG MANGKURAT UNIVERSITY IN BANJARBARU |
Abstract
PDF
|
Syarif Abdillah Malik, Rusliansyah Rusliansyah, Muhammad Afief Ma’ruf |
|
Vol 3, No 1 (2019): CERUCUK VOL. 3 NO. 1 JANUARY 2019 |
INVENTORY THE CHARACTERISTICS OF THE RIVER VETERAN BANJARMASIN CITY FROM TEMPEKONG (STA 0+000) UNTIL THE MARKET KURIPAN(STA 1+219) |
Abstract
PDF
|
Al-Harisnor Al-Harisnor, Maya Amalia, M. Azhari Noor |
|
Vol 6, No 9 (2022): CERUCUK VOL. 6 NO. 9 SEPTEMBER 2022 |
KBDI Analysis of Peatland Drought Index Modification in Liang Anggang Protected Forest Area Block 1 |
Abstract
PDF
|
Aditya Dyastawan, Novitasari Novitasari |
|
Vol 8, No 1 (2024): CERUCUK VOL. 8 NO. 1 JANUARY 2024 |
LEVEL OF WORKABILITY AND MECHANICAL BEHAVIOR OF FLOW CONCRETE WITH FLY ASH UTILIZATION WITH VISCOCRETE 1050 HE |
Abstract
PDF
|
Ridho Riyandi |
|
Vol 6, No 1 (2022): CERUCUK VOL. 6 NO. 1 JANUARY 2022 |
MARSHALL CHARACTERISTICS ANALYSIS USING VARIATION WITHOUT BROKEN AND MANY FRACTURES OF GRAVEL ON MIXED HOT ROLLED SHEET - WEARING COURSE (HRS-WC) |
Abstract
PDF
|
Dela Permata Sari, Yasrudin Yasrudin |
|
Vol 7, No 1 (2023): CERUCUK VOL. 7 NO. 1 JANUARY 2023 |
MATERIAL MANAGEMENT SYSTEM ON NARROW LAND IN THE TOTAL REHAB PROJECT OF THE NEW PEMURUS HEALTH CENTER |
Abstract
PDF
|
Muhammad Ferdy Perdana Muchlis, Retna Hapsari Kartadipura, Abdul Karim |
|
Vol 1, No 1 (2017): CERUCUK VOL. 1 NO. 1 JANUARI 2017 |
NOT SIGNALIZED INTERCHANGES ANALYSIS ON EDUCATIONAL PATH-GUNTUNG ALABAN IN MARTAPURA KAB. BANJAR |
Abstract
PDF
|
Mahdi Noor Erdin, Rosehan Anwar |
|
Vol 6, No 4 (2022): CERUCUK, VOL 6. NO. 4 APRIL 2022 |
OVERVIEW OF THE MECHANICAL PROPERTIES OF HIGH FLOWABILITY CONCRETE USING LADUNG ANDESITE STONE WITH SUPERPLASTICIZER |
Abstract
PDF
|
Muhammad Syarif Syahputera, Nursiah Chairunnisa |
|
Vol 7, No 7 (2023): CERUCUK, VOL. 7 NO. 7 JULY 2023 |
PARAMETER ANALYSIS OF PILE BEARING CAPACITY BASED ON LOADING TEST AND NUMERICAL METHODS |
Abstract
PDF
|
Made Intan Nursabrina, Yulian Firmana Arifin |
|
Vol 8, No 3 (2024): CERUCUK, VOL 8. NO. 3 MARCH 2024 |
PERFORMANCE ANALYSIS OF JEND AHMAD YANI ROAD KM.7 BANJAR REGENCY DUE TO MARKET ACTIVITIES |
Abstract
PDF
|
Andhika Surya Saputera, Puguh Budi Prakoso |
|
Vol 8, No 6 (2024): CERUCUK VOL 8 NO. 6 JUNE 2024 |
PERFORMANCE ANALYSIS OF STREET AHMAD YANI KM 27 DUE TO THE SP. ROAD REHABILITATION WORK PROJECT. LIANG ANGGANG - BTS. TRAINING CITY SECTION 1 BANJARBARU CITY |
Abstract
PDF
|
M. Ikhsan Khalikinor, Yasruddin Yasruddin |
|
Vol 6, No 6 (2022): CERUCUK, VOL 6. NO. 6 JUNE 2022 |
PERFORMANCE ANALYSIS OF T JUNCTION ON SMP 3 STREET – SEKUMPUL UJUNG STREET IN MARTAPURA CITY |
Abstract
PDF
|
Ryend Pratama Syah, Iphan Fitrian Radam |
|
Vol 1, No 1 (2017): CERUCUK VOL. 1 NO. 1 JANUARI 2017 |
PERFORMANCE ANALYSIS OF TRAFFIC FLOW USING GREENSHIELDS, GREENBERGH, AND UNDERWOOD METHODS ON AHMAD YANI KM 40 MARTAPURA ROAD |
Abstract
PDF
|
Cathleen Ariela T S, Rosehan Anwar |
|
Vol 4, No 1 (2020): CERUCUK VOL. 4 NO. 1 JAN 2020 |
PERFORMANCE ANALYSIS OF UNSIGNALIZED INTERSECTION ON PERJUANGAN AND VETERAN STREET MARTAPURA BANJAR DISTRICT |
Abstract
PDF
|
Achmad Fajar, Yasruddin Yasruddin |
|
Vol 1, No 1 (2017): CERUCUK VOL. 1 NO. 1 JANUARI 2017 |
PERFORMANCE ANALYSIS OF URBAN ROADS JALAN A. YANI KM. 34, BANJARBARU |
Abstract
PDF
|
Idham Kholid, Rosehan Anwar |
|
Vol 7, No 6 (2023): CERUCUK, VOL. 7 NO. 6 JUNE 2023 |
PERFORMANCE ANALYSIS TUGU KETUPAT KANDANGAN II ROUNDABOUT |
Abstract
PDF
|
Majdina Nurin, Muhammad Arsyad |
|
Vol 8, No 5 (2024): CERUCUK VOL 8 NO. 5 MAY 2024 |
Pileslab Design in Pabaungan Hilir, Candi Laras Selatan District, Tapin Regency, South Kalimantan |
Abstract
|
Rif’at Syahdana, Yulian Firmana Arifin |
|
Vol 7, No 5 (2023): CERUCUK, VOL. 7 NO. 5 MAY 2023 |
Planning Cash Flow Payment Systems Progress per 25% EST and LST Conditions in the State Court Office Building Project, Balangan Regency |
Abstract
PDF
|
Ahmad Zidni Muzandry, Henry Wardhana |
|
Vol 5, No 1 (2021): CERUCUK VOL. 5 NO. 1 JANUARY 2021 |
PLANNING EVALUATION OF RIGID PAVEMENT’S THICKNESS ON INTERSECTION OF A ROAD SEGMENT OF SIKUI KM. 34 NATIONAL ROAD STA. 0+000 S/D 0+300 EAST BARITO DISTRICT |
Abstract
PDF
|
Agung Rubian Dwi Putra, Yasruddin Yasruddin |
|
Vol 1, No 3 (2017): CERUCUK VOL. 1 NO. 3 MARCH 2017 |
PLANNING IMPLEMENTATION OF TIME ON REPEATING PROJECT WITH LINE OF BALANCE METHOD |
Abstract
PDF
|
Cindy A. Usyor, Henry Wardhana |
|
Vol 5, No 1 (2021): CERUCUK VOL. 5 NO. 1 JANUARY 2021 |
PLANNING TO REPAIR THE APPROACH SLABS BRIDGE MUARA TABIRAI, RANTAU – KANDANGAN |
Abstract
PDF
|
Ade Nafis Prawira |
|
Vol 7, No 4 (2023): CERUCUK, VOL. 7 NO. 4 APRIL 2023 |
PRODUCTIVITY ANALYSIS OF HEAVY EQUIPMENT WORKING TIME ON THE ROAD PRESERVATION PROJECT OF RANTAU-KANDANGAN-DS. BAGAMBIR–HAMBAWANG BEACH–MANTIMIN–PARINGIN |
Abstract
PDF
|
Maulida Zahra, Candra Yuliana |
|
76 - 100 of 149 Items |
<< < 1 2 3 4 5 6 > >> |