Browse Title Index


 
Issue Title
 
Vol 7, No 4 (2023): CERUCUK, VOL. 7 NO. 4 APRIL 2023 Analysis of the Factors Causing Delay in Project Work (Case Study: Governor Syarkawi Road, South Kalimantan) Abstract   PDF
Rona'a Ambarwati, Henry Wardhana
 
Vol 8, No 1 (2024): CERUCUK VOL. 8 NO. 1 JANUARY 2024 ANALYSIS OF THE IMPACT OF CLIMATE VARIABLES ON BANJARBARU CITY RAINFALL Abstract   PDF
Amin Dawamudin
 
Vol 9, No 3 (2025): CERUCUK VOL. 9 NO. 3 MARCH 2025 ANALYSIS OF THE IMPACT OF CROSS-SECTIONAL MODIFICATION ON THE FLOOD POTENTIAL OF GUNTUNG PAYUNG RIVER USING HEC-RAS SOFTWARE Abstract   PDF
Yogie Setiawan Pernanda, Eddy Nashrullah
 
Vol 8, No 3 (2024): CERUCUK, VOL 8. NO. 3 MARCH 2024 ANALYSIS OF THE INFLUENCE OF CHANNELS DISTANCE ON WATER BALANCE CALCULATIONS IN THE LIANG ANGGANG PROTECTED FOREST AREA BLOCK 1 Abstract   PDF
Muhammad Maulana, Novitasari Novitasari
 
Vol 7, No 3 (2023): CERUCUK, VOL. 7 NO. 3 MARCH 2023 Analysis Of The Influence Of The School Safety Zone (Case Study on Jalan Ahmad Yani SDN 4 Guntung Manggis, Landasan Ulin District, Banjarbaru City) Abstract   PDF
Akhmad Fadqur Rahman, Muhammad Arsyad
 
Vol 7, No 5 (2023): CERUCUK, VOL. 7 NO. 5 MAY 2023 ANALYSIS OF THE SERVICE LEVEL OF THE AHMAD YANI STREET KM. 32.5 DUE TO SCHOOL SAFE ZONE (ZOSS) AT SDN 1 LOKTABAT UTARA Abstract   PDF
Aulia Husna Anggraini, Muhammad Arsyad
 
Vol 1, No 2 (2017): CERUCUK VOL. 1 NO. 2 FEBRUARI 2017 ANALYSIS OF TRAFFIC FLOW PERFORMANCE COMPARISON METHOD USING MKJI, MODEL GREENSHIELDS, GREENBERG, AND UNDERWOOD AT JALAN AHMAD YANI KM.32 BANJARBARU (STA 32+450 - 32+650) Abstract   PDF
Said Lutfi Zainur Hamid, Rosehan Anwar
 
Vol 8, No 1 (2024): CERUCUK VOL. 8 NO. 1 JANUARY 2024 ANALYSIS OF WATER AVAILABILITY AND WATER DEMAND IN PEMATANG PANJANG AGRICULTURAL AREA Abstract   PDF
Moh Alfianoor Risyandha
 
Vol 9, No 4 (2025): CERUCUK VOL. 9 NO. 4 APRIL 2025 ANALYSIS OF WATER AVAILABILITY IN CEMPAKA RESERVOIR AND GUNUNG KUPANG RESERVOIR FOR FLOOD CONTROL IN CEMPAKA DISTRICT BANJARBARU CITY Abstract   PDF
Rahma Danianty, Novitasari Novitasari, Elma Sofia
 
Vol 9, No 4 (2025): CERUCUK VOL. 9 NO. 4 APRIL 2025 ANALYSIS OF WATER AVAILABILITY IN THE KAMPUNG BANJAR RESERVOIR AND KEBUN RAYA RESERVOIR IN BANJARBARU CITY FOR MEETING WATER NEEDS Abstract   PDF
Salsabila Zata Alifa, Novitasari Novitasari, Elma Sofia
 
Vol 1, No 3 (2017): CERUCUK VOL. 1 NO. 3 MARCH 2017 ANALYSIS SERVICE LEVEL AHMAD YANI ROAD SEGMENT KM. 7 DISTRICT OF BANJAR Abstract   PDF
Dyah Ayu Vertikasari, Rosehan Anwar
 
Vol 8, No 4 (2024): CERUCUK VOL 8 NO. 4 APRIL 2024 BEARING CAPACITY AND SOIL SETTLEMENT ANALYSIS BASED ON CONE PENETRATION TEST (CPT) Abstract   PDF
Annisa Annisa, Yulian Firmana Arifin, Muhammad Afief Ma’ruf
 
Vol 3, No 1 (2019): CERUCUK VOL. 3 NO. 1 JANUARY 2019 BRIDGE RE-DESIGN CLASS A COMPOSITE GIRDER (GIRDER BRIDGE CASE STUDY OF COMPOSITE CLASS C+) RANTAU BAKULA BANJAR DISTRICT Abstract   PDF
Riyan Noor Cahyo, Syahril Taufik
 
Vol 6, No 1 (2022): CERUCUK VOL. 6 NO. 1 JANUARY 2022 CASE STUDY OF THE CAUSES OF FAILURE OF COMBINATION OF GABION AND GEOTEXTILE CONSTRUCTION TO HANDLE LANDSLIDES ON THE SLOPE OF KARIANGAU SUBSTATION, BALIKPAPAN, EAST BORNEO Abstract   PDF
Desy Rahmadania, Rusdiansyah Rusdiansyah
 
Vol 5, No 2 (2021): CERUCUK VOL. 5 NO. 2 FEBRUARY 2021 CASH FLOW DESIGN STUDY IN ROAD WORKS-ROAD WIDENING PROJECT ON KURNIA STREET NORTH LANDASAN ULIN BANJARBARU Abstract   PDF
Ahmad Anshori, Candra Yuliana
 
Vol 6, No 5 (2022): CERUCUK, VOL 6. NO. 5 MAY 2022 CASH FLOW PLANNING STUDY ON THE HEAVY REHAB PROJECT OF THE ASH SHIRATAL MUSTAQIM TANJUNG GREAT MOSQUE PHASE 1 Abstract   PDF
Puteri Dian Novita, Retna Hapsari Kartadipura
 
Vol 5, No 1 (2021): CERUCUK VOL. 5 NO. 1 JANUARY 2021 CHANGE OF MAXIMUM RAIN PATTERN BASED ON RAINFALL DATA OF BANJARBARU CLIMATOLOGY STATION CAUSED BY CLIMATE CHANGE Abstract   PDF
Ahdianoor Fahraini, Achmad Rusdiansyah
 
Vol 8, No 7 (2024): CERUCUK VOL 8 NO. 7 JULY 2024 CHARACTERISTICS OF FLY ASH-BASED GEOPOLYMER MORTAR WITH VARIATION OF TYPES AND DOSAGES OF ADMIXTURE AND CURING SYSTEMS Abstract   PDF
Agus Sholihin Sofyani, Nursiah Chairunnisa
 
Vol 7, No 2 (2023): CERUCUK VOL. 7 NO. 2 FEBRUARY 2023 COMPARATIVE ANALYSIS OF PROJECT SCHEDULING TIME WITH PDM AND PERT METHODS (CASE STUDY: REHABILITATION PROJECT OF KIRAM ROAD – MAWAR MOUNTAIN) Abstract   PDF
Dahliani Anjar Sari, Candra Yuliana
 
Vol 10, No 7 (2026): CERUCUK VOL. 10 NO. 7 JULY 2026 COMPARATIVE STUDY OF DESIGN VARIATIONS OF SIZES AND POSITIONS OF OPENINGS IN SHEARWALLS FOR HOTEL BUILDINGS ON SOFT LAND Abstract   PDF
Cariani Sinaga, Ade Yuniati Pratiwi
 
Vol 10, No 3 (2026): CERUCUK VOL. 10 NO. 3 MARCH 2026 COMPARISON OF SCHEDULING USING CPM AND PDM METHODS IN THE RECONSTRUCTION PROJECT OF JALAN BUMI MAKMUR – PULAU SARI, BUMI MAKMUR DISTRICT, TANAH LAUT REGENCY, SOUTH KALIMANTAN Abstract   PDF
Rihadatul Isi Ramda, Candra Yuliana
 
Vol 6, No 2 (2022): CERUCUK VOL. 6 NO. 2 FEBRUARY 2022 COMPARISON OF THE EFFECTIVENESS OF BUILDING INFORMATION MODELING BASED COST ESTIMATION AGAINST THE CONTRACTOR'S COST BUDGET PLAN IN DEVELOPMENT PROJECT OF BANJARBARU BAUNTUNG MARKET Abstract   PDF
Muhammad Hanugrah Adipratama, Husnul Khatimi
 
Vol 8, No 2 (2024): CERUCUK VOL. 8 NO. 2 FEBRUARY 2024 COMPARISON STUDY OF DESIGN SHEARWALL VARIATIONS PLACEMENT ON MOMENT FRAME SYSTEM AND DUAL SYSTEMS FOR REINFORCED CONCRETE BUILDINGS IN SEISMIC DESIGN CATEGORY ZONE D Abstract   PDF
Muhaimin Ardiansyah
 
Vol 6, No 7 (2022): CERUCUK, VOL 6. NO. 7 JULY 2022 COMPRESSIVE AND FLEXURAL BEHAVIOR OF FERROCEMENT AND FERRO-GEOPOLYMER USING VARIOUS NUMBER OF WIRE MESH LAYERS Abstract   PDF
Yusral Inayah, Nursiah Chairunnisa
 
Vol 10, No 1 (2026): CERUCUK VOL. 10 NO. 1 JANUARY 2026 COST AND TIME CONTROL STUDY USING EARNED VALUE MANAGEMENT METHODS IN FENCE AND GATE CONSTRUCTION PROJECTS POLYTECHNIC MUARA TEWEH Abstract   PDF
Juniandra Nufusyah Shakilla, Endah Widiastuti
 
51 - 75 of 222 Items << < 1 2 3 4 5 6 7 8 9 > >>