COST AND TIME CONTROL STUDY USING EARNED VALUE MANAGEMENT METHODS IN FENCE AND GATE CONSTRUCTION PROJECTS POLYTECHNIC MUARA TEWEH

Juniandra Nufusyah Shakilla, Endah Widiastuti

Abstract


This research focuses on controlling costs and time in the Fence and Gate Construction Project at Muara Teweh Polytechnic using the Earned Value Management method. This research aims to evaluate project performance by analyzing plan schedule data, weekly progress reports, and project budget (CBP) to assess the actual status of project costs and schedule. The results of direct interviews showed that the project experienced delays due to shortages of materials, delays in the arrival of materials, and unfavorable weather conditions, which caused deviations from the planned schedule. The analysis uses three main indicators: BCWS, BCWP, ACWP. The results show that from week 8 to week 15, the project experienced delays, although it did not cause cost overruns during the 16 week duration. This study concludes that the implementation of EVM can serve as a valuable reference for anticipating potential cost and time deviations in future project phases.

 

Keywords: Earned Value Management, Time Performance, Cost Performance


Full Text:

PDF

References


Annas, F. M., Solikin, M., Harnaeni, S. R., & Sunarjono, S. (2024). Evaluasi Kinerja Biaya dan Waktu Pelaksanaan Menggunakan Metode Earned Value (EVM) (Studi Kasus: Proyek Pengendalian Banjir Kali Lamong). Wahana Teknik Sipil: Jurnal Pengembangan Teknik Sipil, 29(2), 370-381.

Bukit, I. N. M. 2017. Pengertian interface management dalam organisasi proyek konstruksi. Jurnal Teknik Sipil Unaya, 3(1), 24-30.

Ismael, I. 2013. Keterlambatan Proyek Konstruksi Gedung Faktor Penyebab dan Tindakan Pencegahannya. Jurnal Momentum ISSN: 1693-752X, 14(1).

Juliana, J. 2016. Analisa Pengendalian Biaya Dan Waktu Pada Proyek Konstruksi Dengan Metode Earned Value Management (EVM). Faktor Exacta, 9(3), 257-265.

Lamato, F. I., Utiarahman, A., & Tuloli, M. Y. 2022. Analisis Earned Value Terhadap Proyek Pembangunan Renovasi Gedung Kantor Bpjn. Jurnal Vokasi Sains Dan Teknologi, 1(2).

Mahapatni, I. A. P. S. 2019. Metode perencanaan dan pengendalian proyek konstruksi.

Megawati, L. A. 2021. Analisis faktor keterlambatan proyek konstruksi bangunan gedung. Jurnal Teknik. Majalah Ilmiah Fakultas Teknik UNPAK, 21(2).

Nurdiana, A. 2015. Analisis biaya tidak langsung pada proyek pembangunan best western star hotel & star apartement semarang. Teknik, 36(2), 105-109.

Rahmanto, T., & Janizar, S. 2022. Pengendalian Biaya dan Waktu dengan Metode Earned Value Proyek Familia Urban Bekasi. Jurnal Teknik Sipil Cendekia (JTSC), 3(2), 331-342.

Tolangi, M. F., Rantung, J. P., Langi, J. E. C., & Sibi, M. 2012. Analisis cash flow optimal pada kontraktor proyek pembangunan perumahan. Jurnal Sipil Statik, 1(1).




DOI: https://doi.org/10.20527/crc.v10i1.18105

Refbacks

  • There are currently no refbacks.


Copyright (c) 2026 Juniandra Nufusyah Shakilla, Endah Widiastuti



Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License. 

joomla
statistics View My Stats

Indexed By:

 

GOOGLE SCHOLAR : Kutipan = 2, H-index = 1, i10-index = 0