| Issue | Title | |
| Vol 9, No 3 (2025): CERUCUK VOL. 9 NO. 3 MARCH 2025 | ANALYSIS OF OVERTIME WORK PRODUCTIVITY AND WAGE SUITABILITY IN THE WORKFORCE OF THE BANJARMASIN-MARTAPURA ROAD RECONSTRUCTION PROJECT SECTION II | Abstract PDF |
| Ahmad Badarudin, Candra Yuliana, Humaira Afrila | ||
| Vol 10, No 2 (2026): CERUCUK VOL. 10 NO. 2 FEBRUARY 2026 | ANALYSIS OF OVERTIME WORK PRODUCTIVITY IN CONSTRUCTION LABOR ON THE SYAMSUDDIN NOOR INTERNATIONAL AIRPORT ACCESS ROAD CONSTRUCTION PROJECT | Abstract PDF |
| Neysa Claretha Tabita, Retna Hapsari Kartadipura | ||
| Vol 10, No 1 (2026): CERUCUK VOL. 10 NO. 1 JANUARY 2026 | ANALYSIS OF PACINAN RIVER NORMALIZATION CONSIDERING RIVER MOUTH CONSTRICTION USING HEC-RAS SOFTWARE | Abstract PDF |
| Muhammad Hafi, Elma Sofia, Novitasari Novitasari | ||
| Vol 9, No 6 (2025): CERUCUK VOL. 9 NO. 6 JUNE 2025 | ANALYSIS OF PARKING CHARACTERISTICS AND CAPACITY AT THE SULTAN AGUNG ISLAMIC HOSPITAL BANJARBARU | Abstract PDF |
| Dewi Puspita, Utami Sylvia Lestari | ||
| Vol 7, No 3 (2023): CERUCUK, VOL. 7 NO. 3 MARCH 2023 | ANALYSIS OF PARKING SPACE REQUIREMENTS IN PLANNED AREA 3 (KELAYAN PARK) WEST KELAYAN BANJARMASIN | Abstract PDF |
| Ayra Faza Rusyda, Muhammad Arsyad | ||
| Vol 7, No 4 (2023): CERUCUK, VOL. 7 NO. 4 APRIL 2023 | ANALYSIS OF PAVEMENT THICKNESS OF ROAD REHABILITATION PROJECT SP. LIANG ANGGANG –CITY BOUNDARY OF PELAIHARI SECTION 1 (STA. 3+700 - STA. 7+300) CITY OF BANJARBARU | Abstract PDF |
| Endang Sulistyani, Yasruddin Yasruddin | ||
| Vol 9, No 1 (2025): CERUCUK VOL. 9 NO. 1 JANUARY 2025 | ANALYSIS OF PRODUCTIVITY AND COST OF HEAVY EQUIPMENT IN GRADED PAVEMENT WORK ON THE SYAMSUDIN NOOR INTERNATIONAL AIRPORT ACCESS ROAD CONSTRUCTION PROJECT | Abstract PDF |
| Muhammad Ikhsan Alfandi, Abdul Karim | ||
| Vol 10, No 6 (2026): CERUCUK VOL. 10 NO. 6 JUNE 2026 | ANALYSIS OF PROJECT EFFECTIVENESS COMPARISON WITH AND WITHOUT USING COST BUDGET PLAN AND TIME SCHEDULE USING PRECEDENCE DIAGRAM METHOD SCHEDULING | Abstract PDF |
| Muhammad Bahrani, Endah Widiastuti, Nada Salsabila | ||
| Vol 7, No 7 (2023): CERUCUK, VOL. 7 NO. 7 JULY 2023 | ANALYSIS OF ROAD DAMAGE CONDITION USING THE PAVEMENT CONDITION INDEX (PCI) METHOD ON THE ROAD SEGMENT OF GUBERNUR SARKAWI, BARITO KUALA REGENCY (STA 4+000 – 9+000) | Abstract PDF |
| Muhammad Alvin Rachim, Muhammad Arsyad | ||
| Vol 7, No 1 (2023): CERUCUK VOL. 7 NO. 1 JANUARY 2023 | ANALYSIS OF SCHEDULING USING CPM AND PDM METHODS WITH MICROSOFT PROJECT 2019 IN THE REPLACEMENT PROJECT OF SALIM RIVER BRIDGE MATARAMAN | Abstract PDF |
| Della Ayu Safitri, Henry Wardhana | ||
| Vol 6, No 3 (2022): CERUCUK VOL. 6 NO. 3 MARCH 2022 | ANALYSIS OF SHALLOW GROUND WATER CAPACITY TESTING WITH PUMPING TEST METHOD | Abstract PDF |
| Noor Irma Rizki, Noordiah Helda | ||
| Vol 6, No 3 (2022): CERUCUK VOL. 6 NO. 3 MARCH 2022 | ANALYSIS OF T JUNCTION ON PRAMUKA STREET – DHARMA BUDI STREET, BANJARMASIN CITY | Abstract PDF |
| Muhammad Nur Akbar, Iphan Fitrian Radam | ||
| Vol 10, No 1 (2026): CERUCUK VOL. 10 NO. 1 JANUARY 2026 | ANALYSIS OF THE APPLICATION OF OCCUPATIONAL SAFETY AND HEALTH MANAGEMENT SYSTEM (K3) IN THE CONSTRUCTION PROJECT OF THE OFFICE BUILDING OF THE DPRD BUILDING PHASE 1 OF THE PROVINCE OF SOUTH KALIMANTAN BANJARBARU | Abstract PDF |
| Siti Munawwaroh, Eliatun Eliatun | ||
| Vol 10, No 2 (2026): CERUCUK VOL. 10 NO. 2 FEBRUARY 2026 | ANALYSIS OF THE APPLICATION OF THE CONSTRUCTION SAFETY MANAGEMENT SYSTEM (CSMS) TO THE COST BUDGET PLAN (CBP) IN THE SYAMSUDIN NOOR INTERNATIONAL AIRPORT ACCESS ROAD CONSTRUCTION PROJECT | Abstract PDF |
| Zahra Aulia, Retna Hapsari Kartadipura | ||
| Vol 10, No 3 (2026): CERUCUK VOL. 10 NO. 3 MARCH 2026 | ANALYSIS OF THE APPLICATION OF TIME MANAGEMENT IN THE RECONSTRUCTION PROJECT OF JALAN BINDERANG – SUNGAI IMPAT | Abstract PDF |
| Atika Alifia Putri, Husnul Khatimi | ||
| Vol 8, No 2 (2024): CERUCUK VOL. 8 NO. 2 FEBRUARY 2024 | Analysis of the Budget Plan (RAB) with the Concept of Building Information Modeling (BIM) in the Banjarbaru At-Taqwa Mosque Development Project | Abstract PDF |
| Agung Motik Pratikno, Husnul Khatimi | ||
| Vol 6, No 2 (2022): CERUCUK VOL. 6 NO. 2 FEBRUARY 2022 | ANALYSIS OF THE CHARACTERISTICS AND PARKING NEEDS OF PARINGIN MARKET, BALANGAN REGENCY | Abstract PDF |
| Egga Yosana, Muhammad Arsyad | ||
| Vol 8, No 5 (2024): CERUCUK VOL 8 NO. 5 MAY 2024 | ANALYSIS OF THE CHARACTERISTICS AND PARKING NEEDS OF RATU ZALECHA GENERAL HOSPITAL | Abstract |
| M D Azzana, Muhammad Arsyad | ||
| Vol 7, No 3 (2023): CERUCUK, VOL. 7 NO. 3 MARCH 2023 | ANALYSIS OF THE CHARACTERISTICS AND REQUIREMENT OF PARKING AREAS AT KUBAH DATU KALAMPAYAN TERMINAL ASTAMBUL DISTRICT, SOUTH KALIMANTAN | Abstract PDF |
| Nor Astika, Muhammad Arsyad | ||
| Vol 7, No 7 (2023): CERUCUK, VOL. 7 NO. 7 JULY 2023 | ANALYSIS OF THE EFFECT OF PARKING ON THE STREET AGENCY ON THE PERFORMANCE OF THE BANJARMASIN VETERAN ROAD | Abstract PDF |
| Ahmad Naufal Adriannoor, Iphan Fitrian Radam | ||
| Vol 8, No 4 (2024): CERUCUK VOL 8 NO. 4 APRIL 2024 | ANALYSIS OF THE EFFECT OF SCHOOL SAFETY ZONE (ZOSS) ON-ROAD PERFORMANCE (Case Study of Veteran Street SDN 1,2,6 Dirgahayu Pulau Laut Utara Sub-district Kotabaru Regency) | Abstract PDF |
| Said Ahmad Zaki Albahasim, Muhammad Arsyad | ||
| Vol 7, No 5 (2023): CERUCUK, VOL. 7 NO. 5 MAY 2023 | ANALYSIS OF THE EFFECT OF SIDE BARRIERS ON THE PERFORMANCE OF ROAD SECTIONS RIGHT IN FRONT OF THE SIMPLE MARKET ON JALAN SUTOYO S BANJARMASIN | Abstract PDF |
| Nella Agustin, Muhammad Arsyad | ||
| Vol 10, No 5 (2026): CERUCUK VOL. 10 NO. 5 MAY 2026 | ANALYSIS OF THE EFFECT OF SIDE OBSTACLES ON STALL DEA 2 ON THE PERFORMANCE OF JALAN AHMAD YANI, BARABAI CITY | Abstract PDF |
| Daffa Febri Irshandy, Muhammad Arsyad | ||
| Vol 7, No 4 (2023): CERUCUK, VOL. 7 NO. 4 APRIL 2023 | ANALYSIS OF THE EFFECT OF THE IMPLEMENTATION OF THE CONSTRUCTION SAFETY PROGRAM (K2) ON WORKER PERFORMANCE PRODUCTIVITY OF ROAD PRESERVATION PROJECTS | Abstract |
| Linda Rahmawati, Candra Yuliana | ||
| Vol 10, No 4 (2026): CERUCUK VOL. 10 NO. 4 APRIL 2026 | ANALYSIS OF THE EFFECTIVENESS OF PEDESTRIAN CROSSING BRIDGE (JPO) FACILITIES IN BANJARBARU CITY | Abstract PDF |
| Erwin Rony Fadhilah, Nova Widayanti, Muhammad Alfian Noor | ||
| 26 - 50 of 222 Items | << < 1 2 3 4 5 6 7 8 9 > >> | |


