Browse Title Index


 
Issue Title
 
Vol 9, No 3 (2025): CERUCUK VOL. 9 NO. 3 MARCH 2025 ANALYSIS OF OVERTIME WORK PRODUCTIVITY AND WAGE SUITABILITY IN THE WORKFORCE OF THE BANJARMASIN-MARTAPURA ROAD RECONSTRUCTION PROJECT SECTION II Abstract   PDF
Ahmad Badarudin, Candra Yuliana, Humaira Afrila
 
Vol 10, No 2 (2026): CERUCUK VOL. 10 NO. 2 FEBRUARY 2026 ANALYSIS OF OVERTIME WORK PRODUCTIVITY IN CONSTRUCTION LABOR ON THE SYAMSUDDIN NOOR INTERNATIONAL AIRPORT ACCESS ROAD CONSTRUCTION PROJECT Abstract   PDF
Neysa Claretha Tabita, Retna Hapsari Kartadipura
 
Vol 10, No 1 (2026): CERUCUK VOL. 10 NO. 1 JANUARY 2026 ANALYSIS OF PACINAN RIVER NORMALIZATION CONSIDERING RIVER MOUTH CONSTRICTION USING HEC-RAS SOFTWARE Abstract   PDF
Muhammad Hafi, Elma Sofia, Novitasari Novitasari
 
Vol 9, No 6 (2025): CERUCUK VOL. 9 NO. 6 JUNE 2025 ANALYSIS OF PARKING CHARACTERISTICS AND CAPACITY AT THE SULTAN AGUNG ISLAMIC HOSPITAL BANJARBARU Abstract   PDF
Dewi Puspita, Utami Sylvia Lestari
 
Vol 7, No 3 (2023): CERUCUK, VOL. 7 NO. 3 MARCH 2023 ANALYSIS OF PARKING SPACE REQUIREMENTS IN PLANNED AREA 3 (KELAYAN PARK) WEST KELAYAN BANJARMASIN Abstract   PDF
Ayra Faza Rusyda, Muhammad Arsyad
 
Vol 7, No 4 (2023): CERUCUK, VOL. 7 NO. 4 APRIL 2023 ANALYSIS OF PAVEMENT THICKNESS OF ROAD REHABILITATION PROJECT SP. LIANG ANGGANG –CITY BOUNDARY OF PELAIHARI SECTION 1 (STA. 3+700 - STA. 7+300) CITY OF BANJARBARU Abstract   PDF
Endang Sulistyani, Yasruddin Yasruddin
 
Vol 9, No 1 (2025): CERUCUK VOL. 9 NO. 1 JANUARY 2025 ANALYSIS OF PRODUCTIVITY AND COST OF HEAVY EQUIPMENT IN GRADED PAVEMENT WORK ON THE SYAMSUDIN NOOR INTERNATIONAL AIRPORT ACCESS ROAD CONSTRUCTION PROJECT Abstract   PDF
Muhammad Ikhsan Alfandi, Abdul Karim
 
Vol 10, No 6 (2026): CERUCUK VOL. 10 NO. 6 JUNE 2026 ANALYSIS OF PROJECT EFFECTIVENESS COMPARISON WITH AND WITHOUT USING COST BUDGET PLAN AND TIME SCHEDULE USING PRECEDENCE DIAGRAM METHOD SCHEDULING Abstract   PDF
Muhammad Bahrani, Endah Widiastuti, Nada Salsabila
 
Vol 7, No 7 (2023): CERUCUK, VOL. 7 NO. 7 JULY 2023 ANALYSIS OF ROAD DAMAGE CONDITION USING THE PAVEMENT CONDITION INDEX (PCI) METHOD ON THE ROAD SEGMENT OF GUBERNUR SARKAWI, BARITO KUALA REGENCY (STA 4+000 – 9+000) Abstract   PDF
Muhammad Alvin Rachim, Muhammad Arsyad
 
Vol 7, No 1 (2023): CERUCUK VOL. 7 NO. 1 JANUARY 2023 ANALYSIS OF SCHEDULING USING CPM AND PDM METHODS WITH MICROSOFT PROJECT 2019 IN THE REPLACEMENT PROJECT OF SALIM RIVER BRIDGE MATARAMAN Abstract   PDF
Della Ayu Safitri, Henry Wardhana
 
Vol 6, No 3 (2022): CERUCUK VOL. 6 NO. 3 MARCH 2022 ANALYSIS OF SHALLOW GROUND WATER CAPACITY TESTING WITH PUMPING TEST METHOD Abstract   PDF
Noor Irma Rizki, Noordiah Helda
 
Vol 6, No 3 (2022): CERUCUK VOL. 6 NO. 3 MARCH 2022 ANALYSIS OF T JUNCTION ON PRAMUKA STREET – DHARMA BUDI STREET, BANJARMASIN CITY Abstract   PDF
Muhammad Nur Akbar, Iphan Fitrian Radam
 
Vol 10, No 1 (2026): CERUCUK VOL. 10 NO. 1 JANUARY 2026 ANALYSIS OF THE APPLICATION OF OCCUPATIONAL SAFETY AND HEALTH MANAGEMENT SYSTEM (K3) IN THE CONSTRUCTION PROJECT OF THE OFFICE BUILDING OF THE DPRD BUILDING PHASE 1 OF THE PROVINCE OF SOUTH KALIMANTAN BANJARBARU Abstract   PDF
Siti Munawwaroh, Eliatun Eliatun
 
Vol 10, No 2 (2026): CERUCUK VOL. 10 NO. 2 FEBRUARY 2026 ANALYSIS OF THE APPLICATION OF THE CONSTRUCTION SAFETY MANAGEMENT SYSTEM (CSMS) TO THE COST BUDGET PLAN (CBP) IN THE SYAMSUDIN NOOR INTERNATIONAL AIRPORT ACCESS ROAD CONSTRUCTION PROJECT Abstract   PDF
Zahra Aulia, Retna Hapsari Kartadipura
 
Vol 10, No 3 (2026): CERUCUK VOL. 10 NO. 3 MARCH 2026 ANALYSIS OF THE APPLICATION OF TIME MANAGEMENT IN THE RECONSTRUCTION PROJECT OF JALAN BINDERANG – SUNGAI IMPAT Abstract   PDF
Atika Alifia Putri, Husnul Khatimi
 
Vol 8, No 2 (2024): CERUCUK VOL. 8 NO. 2 FEBRUARY 2024 Analysis of the Budget Plan (RAB) with the Concept of Building Information Modeling (BIM) in the Banjarbaru At-Taqwa Mosque Development Project Abstract   PDF
Agung Motik Pratikno, Husnul Khatimi
 
Vol 6, No 2 (2022): CERUCUK VOL. 6 NO. 2 FEBRUARY 2022 ANALYSIS OF THE CHARACTERISTICS AND PARKING NEEDS OF PARINGIN MARKET, BALANGAN REGENCY Abstract   PDF
Egga Yosana, Muhammad Arsyad
 
Vol 8, No 5 (2024): CERUCUK VOL 8 NO. 5 MAY 2024 ANALYSIS OF THE CHARACTERISTICS AND PARKING NEEDS OF RATU ZALECHA GENERAL HOSPITAL Abstract
M D Azzana, Muhammad Arsyad
 
Vol 7, No 3 (2023): CERUCUK, VOL. 7 NO. 3 MARCH 2023 ANALYSIS OF THE CHARACTERISTICS AND REQUIREMENT OF PARKING AREAS AT KUBAH DATU KALAMPAYAN TERMINAL ASTAMBUL DISTRICT, SOUTH KALIMANTAN Abstract   PDF
Nor Astika, Muhammad Arsyad
 
Vol 7, No 7 (2023): CERUCUK, VOL. 7 NO. 7 JULY 2023 ANALYSIS OF THE EFFECT OF PARKING ON THE STREET AGENCY ON THE PERFORMANCE OF THE BANJARMASIN VETERAN ROAD Abstract   PDF
Ahmad Naufal Adriannoor, Iphan Fitrian Radam
 
Vol 8, No 4 (2024): CERUCUK VOL 8 NO. 4 APRIL 2024 ANALYSIS OF THE EFFECT OF SCHOOL SAFETY ZONE (ZOSS) ON-ROAD PERFORMANCE (Case Study of Veteran Street SDN 1,2,6 Dirgahayu Pulau Laut Utara Sub-district Kotabaru Regency) Abstract   PDF
Said Ahmad Zaki Albahasim, Muhammad Arsyad
 
Vol 7, No 5 (2023): CERUCUK, VOL. 7 NO. 5 MAY 2023 ANALYSIS OF THE EFFECT OF SIDE BARRIERS ON THE PERFORMANCE OF ROAD SECTIONS RIGHT IN FRONT OF THE SIMPLE MARKET ON JALAN SUTOYO S BANJARMASIN Abstract   PDF
Nella Agustin, Muhammad Arsyad
 
Vol 10, No 5 (2026): CERUCUK VOL. 10 NO. 5 MAY 2026 ANALYSIS OF THE EFFECT OF SIDE OBSTACLES ON STALL DEA 2 ON THE PERFORMANCE OF JALAN AHMAD YANI, BARABAI CITY Abstract   PDF
Daffa Febri Irshandy, Muhammad Arsyad
 
Vol 7, No 4 (2023): CERUCUK, VOL. 7 NO. 4 APRIL 2023 ANALYSIS OF THE EFFECT OF THE IMPLEMENTATION OF THE CONSTRUCTION SAFETY PROGRAM (K2) ON WORKER PERFORMANCE PRODUCTIVITY OF ROAD PRESERVATION PROJECTS Abstract
Linda Rahmawati, Candra Yuliana
 
Vol 10, No 4 (2026): CERUCUK VOL. 10 NO. 4 APRIL 2026 ANALYSIS OF THE EFFECTIVENESS OF PEDESTRIAN CROSSING BRIDGE (JPO) FACILITIES IN BANJARBARU CITY Abstract   PDF
Erwin Rony Fadhilah, Nova Widayanti, Muhammad Alfian Noor
 
26 - 50 of 222 Items << < 1 2 3 4 5 6 7 8 9 > >>