ANALYSIS OF THE APPLICATION OF TIME MANAGEMENT IN THE RECONSTRUCTION PROJECT OF JALAN BINDERANG – SUNGAI IMPAT
Abstract
Time management is an important factor in ensuring the completion of a project. One of the important aspects of time management is scheduling. In this project, scheduling is based on barchart data, which is then further developed through this research using the PDM method. The data presented in the bar chart only includes the duration and sequence, therefore, a dependency analysis is required to determine the relationships between each work item according to PDM method. The duration analysisis conducted based on other data as listed in the project time schedule. Through the result of analysis, scheduling with the pdm method at Binderang – Sungai Impat Road Reconstruction project resulted a critical path consisting of the following activites, Roadbed Preparation, Ordinary Excavation, Selected Piles from Excavation Sources, Class A Aggregate Foundation Layer, Class B Aggregate Foundation Layer, Fc'15 Mpa Concrete, Prime Coat – Liquid Asphalt/Work Emulsion, and Mobilization 2, and get a total duration of 98 working days, which is 22 days faster than the previous project plan duration of 120 calendar days.
Keywords: Time Management, Scheduling, PDM, Project 2019
Full Text:
PDFReferences
APM. APM Body of Knowledge. In Journal of Lesbian Studies (Vol. 15, Issue 1).
Arifin, Z. (2020). Introduction to Project Management. Education, 9–10.
Ervianto, W. I. (2005). Construction Project Management Third Edition. Construction Project Management-Revised Edition, Revised Edition, Andi, Yogyakarta.
Febriana, W., & Aziz, U. A. (2021). Analyze project scheduling with the PERT methodUse Microsoft Project 2016. ITS Journal of Science and Arts, 5(1), 51–66.
Gea, A. A. (2014). TIME MANAGEMENT: USINGKc. Humanities, 5(2), 777–785.
Indra Khaidir, Embun Sari Ayu, & Mutiara Dwi Putri Andriani. (2022). Implementation of the Precedence Diagram Method (PDM) in Construction Project Control. Journal of Engineering, 12(2), 175–182.
Siregar, A. C., & Iffiginia, I. (2019). The use of the critical path method (CPM) to evaluate the time and cost of project implementation. Engineering: Journal of Science and Technology, 15(2), 102.
DOI: https://doi.org/10.20527/crc.v10i3.18918
Refbacks
- There are currently no refbacks.
Copyright (c) 2026 Atika Alifia Putri, Husnul Khatimi

This work is licensed under a Creative Commons Attribution 4.0 International License.
Indexed By:
GOOGLE SCHOLAR : Kutipan = 2, H-index = 1, i10-index = 0