ANALYSIS OF SCHEDULING USING CPM AND PDM METHODS WITH MICROSOFT PROJECT 2019 IN THE REPLACEMENT PROJECT OF SALIM RIVER BRIDGE MATARAMAN
Abstract
The success of an emergency response project is that it can be completed quickly and on time because of the urgency of the situation so that timely management of implementation is needed by making a schedule. This research was conducted to determine the appropriate scheduling method according to the character of the emergency response construction project. Scheduling methods are used in the form of Critical Path Method (CPM) and Precedence Diagram Method (PDM). The analysis was carried out on the duration and dependencies for each work item which was then scheduled with the help of Microsoft Project 2019 to get the results in the form of network diagrams and critical paths. Based on the results of the scheduling analysis the Replacement Project of Salim River Bridge Mataraman, it was found that for the CPM method the project could be carried out for 129 days starting from January 20, 2021 and ending on May 29, 2021 and for the PDM method the project was carried out for 120 days starting from January 20, 2020 and ends on May 20, 2021 earlier than the CPM method. Each method has two critical paths due to the traffic safety and management work required throughout the project.
Keywords : Critical Path Method (CPM), Precedence Diagram Method (PDM), Microsoft Project 2019
Full Text:
PDFReferences
Anarli, Febriani Inang. 2021. Evaluasi Penjadwalan Menggunakan Precedence Diagram Method dan Percepatan Mengguankan Crash Program. Tugas Akhir. Fakultas Teknik. Universitas Lambung Mangkurat: Banjarbaru.
Ervianto, W. I. 2004. Teori Aplikasi Manajemen Proyek Konstruksi. Yogyakarta: Andi.
Fajarwati, Leny, & Maharani. 2006. Analisis Optimalisasi Percepatan Durasi Proyek dengan Metode Least Cost Analysis.
Husen, A. 2010. Manajemen Proyek: Perencanaan, Penjadwalan, dan Pengendalian Proyek. Yogyakarta: Andi.
Kurzner, H. 1976. Project Manajement Sevent Edition. New York: John Wiley
& Sons Inc.
Marina, 2021. Studi Penjadwalan Menggunakan Metode CPM dan PDM dengan
Microsoft Project 2019 pada Proyek Pembangunan Pondok Darul Hijrah Putera, Kecamatan Martapura, Kabupaten Banjar, Kalimantan Selatan. Tugas Akhir. Fakultas Teknik. Universitas Lambung Mangkurat: Banjarbaru,
Peratutan Lembaga Nomor 13 Tahun 2018 tentang Pengadaan Barang/Jasa dalam
Penanganan Keadaan Darurat.
Rabiah, 2020. Evaluasi Penjadwalan Menggunakan Precedence Diagram Method
dan Percepatan Mneggunakan Crash Program (Studi Kasus Gedung Badan Keuangan Daerah Tahap I). Tugas Akhir. Fakultas Teknik. Universitas Lambung Mangkurat: Banjarbaru.
Riyono, Winarputro Adi. 2012. Teknologi Jembatan Sementara Berbahan Dasar Material Komposit. Bandung: Kementerian Pekerjaan Umum.
Rusdi, H. 2014. Aplikasi TI Dalam Manajemen Konstruksi. Banjarbaru: Deepublish.
Soeharto, I. 1999. Manajemen Konstruksi dari Konseptual Hingga Operasional. Jakarta: Erlangga.
Surbakti, A.A., Harefa, M.B. 2021. Kajian Lean Construction pada Proyek Pembangunan Jaringan Irigasi Sidilanitano Kabupaten Tapanuli Utara. Berastagi: Universitas Quality Berastagi.
Trihendradi. 2008. Mastering Microsoft Project. Yogyakarta: Andi.
Widiasanti, Irika, & Lenggogeni. 2013. Manajemen Konstruksi. Bandung: PT. Remaja Rosdakarya.
DOI: https://doi.org/10.20527/crc.v7i1.8561
Refbacks
- There are currently no refbacks.
Copyright (c) 2023 Della Ayu Safitri, Henry Wardhana
This work is licensed under a Creative Commons Attribution 4.0 International License.
Indexed By:
GOOGLE SCHOLAR : Kutipan = 2, H-index = 1, i10-index = 0