RESCHEDULING USING THE PDM METHOD WITH MICROSOFT PROJECT 2021 IN THE URBAN SLUM QUALITY IMPROVEMENT PROJECT FOR AIR SANTRI, BANJAR REGENCY

Naura Rasyida Nurcahya, Candra Yuliana, Endah Widiastuti

Abstract


In project development planning is a measure of the success of a project, which can determine the allocation of funds, time and quality to be obtained. This planning is combined with the use of special planning software, namely Microsoft Project 2021, which with this software can help make rescheduling easy and can track developments in the field. The data was analyzed using the Precedent Diagram Method (PDM) using the Microsoft Project 2021 application and the resulting plan is a network of all project work scopes. The results of the scheduling analysis of the Air Santri Urban Slum Quality Improvement Project, Banjar Regency, using the Microsoft Project 2021 application is that the project was carried out for 335 days obtained based on the scope of work with the largest duration of this project, namely 12 months 25 days starting on May 21 2021 ending on June 15, 2022. The total duration for each scope of work is Public Open Space (RTP) for 331 days, Retaining Walls (DPT) for 335 days, Roads for 139 days, Pier for 96 days, Waste Management Area (TPS) 170 days duration, SPAL DT 57 days duration and Clean water installation 201 days duration.


Keywords: Microsoft Project 2021, Precedence Diagram Method (PDM), scheduling.

 


Full Text:

PDF

References


Alami, Nurmansyah; Umar Abdul Aziz; Dewi Margiarti. (2021). Studi Komparasi Perbandingan RAB Antara Metode AHSP Dan (SNI). Volume 5, No.1. 10-19.

Hermawan, Aris. (2006). Penggunaan Perangkat Lunak Dalam Pengelolaan Proyek Konstruksi. Volume III, No.1.

Marina. (2021). Studi Penjadwalan Menggunakan Metode CPM dan PDM Dengan Microsoft Project 2019 Pada Proyek Pembangunan Pondok Darul Hijrah Putera, Kec. Martapura, Kab. Banjar, Kalsel. Tugas Akhir. FT ULM : Banjarbaru.

Mujahid, Muhammad Dio. (2021). Penjadwalan Ulang Proyek Rehab Workshop Induk Menjadi Ruang Kelas BBPLK Medan Dengan Metode PDM Menggunakan Software Penjadwalan (Microsoft Project). Tugas Akhir. FT. Univ. MSU : Medan.

Peraturan Mentri PUPR Republik Indonesia Nomor 1 Tahun 2022

Proyek Peningkatan Kualitas Permukiman Kumuh Perkotaan Air Santri (Online)

https://ciptakarya.pu.go.id/v5/berita/detail/Ciptakarya/12017/BPPW-Kalsel-Bangun-Kawasan-Air-Santri-Senilai-Rp32,4-Miliar – 22 Maret 2022

Suherman; Amarina Ilma. (2016). Analisa Penjadwalan Proyek Menggunakan PDM dan Pert Serta Crash Project (Studi Kasus: Pembangunan Gedung Main Power House PT. Adhi Karya). Volume 2, No.1.




DOI: https://doi.org/10.20527/crc.v7i1.7956

Refbacks

  • There are currently no refbacks.


Copyright (c) 2023 Naura Rasyida Nurcahya, Candra Yuliana, Endah Widiastuti



Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License

joomla
statistics View My Stats

Indexed By:

 

GOOGLE SCHOLAR : Kutipan = 2, H-index = 1, i10-index = 0