SCHEDULING STUDY USING THE PDM METHOD IN THE CONSTRUCTION PROJECT OF JALAN SIMPANG 4 ISLAMIC CENTER – TANJUNG SELATAN WITH THE HELP OF PROJECT 2019
Abstract
Project scheduling is a method to measure the duration required by an activity to be completed, scheduling in construction projects is also used to determine the start and finish times of each activity in the project. The Precedence Diagram Method (PDM) is a network with the Activity on Node (AON) model, usually depicted as of a square with arrows that connect between activities that are the link between project activities. Through the results of the analysis in this study, it was found that the duration of the Simpang Islamic Center – Tanjung Selatan Road Construction project, Tabalong Regency, was 214 working days or 259 calendar days and the total normal duration reached 300 calendar days, starting on January 6, 2022 and ending on September 22, 2022.
Keywords: Scheduling, Precedence Diagram Method, Project 2019
Full Text:
PDFReferences
Ardana, P. D. H., & Sudiarsana, I. W. (2023). Rescheduling analysis using the Precedence Diagram Method in the New Classroom Construction Project at Madrasah Tsanawiyah Negeri (Mtsn) Karangasem. Mitsu Scientific Journal (Civil Engineering Information Media, Wiraraja University), 11(2), 51-62.
Fadhlurrahman, M., Widiasanti, I., & Septiandini, E. (2024). Construction Management Analysis in the Construction of Pt. Pjpt Senopati Warehouse. Journal of Tambusai Education, 8(1), 1405-1411.
Hendriputri, A. A. (2018). Schedule acceleration (crashing) using a shift system with Pdm analysis (precedence diagramming method). (Final Project). Faculty of Civil Engineering and Planning, Islamic University of Indonesia, Yogyakarta.
Hia, R. A. P., & Nusa, A. B. (2024). 9Analysis of Project Scheduling Using the Cpm and Pdm Methods Using the Microsoft Project 2019 Application in the Construction Project of the Susua Health Center Building, South Nias Regency. Journal of Civil Engineering (Jtsip), 3(1), 9-15.
Husen, A. 2009. Project Management: Project planning, scheduling, and control. Yogyakarta: C.V Andi Offset.
Iriyanto, S. M., & Rarung, A. Y. (2019). Analysis of the Effectiveness of Scheduling the Papua Flats 1 Project Using the Pert. Journal of Civil Portals, 8(2), 1-11.
Isnanta, C. (2018). Rescheduling Analysis Using Precedence Diagram Method (Rescheduling Analysis with PDM) (Case Study: Bhayangkara Hotel Cabin Construction Project).
Johari, G. J., & Gunawan, A. (2021). Analysis of factors affecting the delay of infrastructure projects in Garut Regency. Journal of Construction, 19(1), 80-89.
Marina. (2021). Scheduling Study Using CPM and Pdm Methods with Microsoft Project 2019 on the Development Project of Pondok Darul Hijrah Putera, Martapura District, Banjar Regency, South Kalimantan. Final Project. Faculty of Engineering. Lambung Mangkurat University: Banjarbaru.
Marques, J. F., & Bernardino, J. (2019, September). Evaluation Of Asana, Odoo, And Projectlibre Project Management Tools Using The Osspal Methodology. In Keod (pp. 397-403).
Muhammad, A., Kurniawan, B., Mufidah, A. P., & Pakarbudi, A. (2021, October). Critical Path Analysis on Scheduling Information System Development Projects Using the Critical Path Method (CPM) Technique (Case Study: Pt. XYZ). In Proceedings of the National Seminar on Applied Science and Technology (Vol. 9, No. 1, pp. 538-547).
Ramadhani, I. D., Zulkarnain, I., Siregar, A. C., & Pratiwi, D. S. (2024). A Project Scheduling Optimization Using the Cpm Method (Case Study: Construction of the Manggis River Road, Sambutan District, Samarinda): Indonesia. Journal Of Civil Engineering Building And Transportation, 8(2), 295-300.
Riana, R., Sanusi, S., Arianto, B., & Bhirawa, W. T. (2022). Optimization of the rescheduling of the construction project of PT PGN Solution gas distribution to customers of the Btpn tower using the PDM and PERT methods. Journal of Industrial Engineering, 11(2), 103-116.
Sajad, M., Sadiq, M., Naveed, K., & Iqbal, M. S. (2016). Software Project Management: Tools Assessment, Comparison And Suggestions For Future Development. International Journal Of Computer Science And Network Security (Ijcsns), 16(1), 31.
Satrio, G., & Latief, Y. (2018). Development Of Risk-Based Standardized Wbs (Work Breakdown Structure) For Safety Planning Of Cable-Stayed Bridge Project. In Proceedings Of The International Conference On Industrial Engineering And Operations Management (Vol. 12, No. 2, pp. 110-117).
Sudarson, W. (2020). Evaluation of project scheduling using the Line of Balance method (Case Study: Hotel Santika Batam). Journal Of Civil Engineering And Planning (Jcep), 1(2), 92-98.
Sutisna, N. W., & Effane, A. (2022). The function of facilities and infrastructure management. Karimah Tauhid, 1(2), 226-233.
Wijaya, R. T. (2020). Analysis of Construction Work Contract on the Construction Project of the Cathedral Church Building in Samarinda. Student Curve, 11(2), 117-122
DOI: https://doi.org/10.20527/crc.v10i2.18914
Refbacks
- There are currently no refbacks.
Copyright (c) 2026 Mutiara Sari, Husnul Khatimi

This work is licensed under a Creative Commons Attribution 4.0 International License.
Indexed By:
GOOGLE SCHOLAR : Kutipan = 2, H-index = 1, i10-index = 0