PERFORMANCE ANALYSIS OF THE SANTA LAZARUS MULTIPURPOSE BUILDING CONSTRUCTION PROJECT USING EARNED VALUE MANAGEMENT (EVM)

Nisa Febriyanti, Eliatun Eliatun

Abstract


Discrepancies in project implementation against the plan are generally caused by time and cost factors. This study aims to evaluate project performance analyzed using the Earned Value Management (EVM) method through the calculation of indicators such as BCWS, BCWP, ACWP, CV, SV, CPI, SPI, EAC, ETC, TCPI, and TE. Evaluation is carried out every month to identify cost and time deviations. The analysis results show that in the 7th month, the ACWP value is Rp 2,502,643,000.00 and the EAC is Rp 3,182,000,000.00 of the total funds allocated Rp 3,440,000,000.00. The project is estimated to be completed in 12 months or the project has accelerated the implementation time and efficiency in the use of the budget.

 


Keywords: Earned Value, Cost, Time


Full Text:

PDF

References


Castollani, A., Puro, S., & Lesmana, M. (2020). Cost and Time Analysis on Apartment Project with Earned Value Concept Method. Journal of Civil Mechanics Construction Engineering, 3(01).

Febrianti, P. P., & Alfandi, B. (2023). Cost and Time Analysis Using the Evm (Earned Value Management) Method. Structure, 5(2), 79-83.

Luthfiyah, S. M., Utiarahman, A., & Tuloli, M. Y. (2022). Implementation of Earned Value Integrated Dormitory Building Construction Project Mts. Negeri 2 Gorontalo Regency. Journal of Road and Bridge Research, 2(2).

Pamadi, M., Umar, U. H., & Chen, N. (2021). Analysis of Project Scheduling Using the EVA (Earned Value Analysis) Method on the De Monde Junction-White Sandy Shophouse Construction Project, Batam. J. Civ. Eng. Plan, 2(2), 188-202.

Putra, I. S., Andayani, K. W., & Rani, N. M. S. (2023, December). Cost and Time Performance Analysis with Earned Value Method in the Sdn 2 Serangan Building Construction Project. In Proceedings of the National Seminar on Vocational Engineering (Vol. 2, No. 1, pp. 245-254).

Rosmayati, I. (2023). Training on Making a Budget Plan (RAB) in Pananjung Village, Tarogong Kaler District, Garut Regency: Training on Making a Budget Plan (RAB) in Pananjung Village, Tarogong Kaler.




DOI: https://doi.org/10.20527/crc.v10i6.20795

Refbacks

  • There are currently no refbacks.


Copyright (c) 2026 Nisa Febriyanti, Eliatun Eliatun



Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License. 

joomla
statistics View My Stats

Indexed By:

 

GOOGLE SCHOLAR : Kutipan = 2, H-index = 1, i10-index = 0