Evaluasi produktivitas alat berat dalam proses pengumpanan batubara di crushing plant PT Binuang Mitra Bersama
Abstract
Keywords
Full Text:
PDFReferences
Modul Ajar Pemindahan Tanah Mekanis, Teknik Pertambangan Universitas Lambung Mangkurat, Banjarbaru, 2004, pp. 5-30.
H.L. Hartman, Introduction Mining Engineering, New York, John Wiley and Sons, 1987, pp 135-139.
A. Gupta, Mineral Processing Design and Operations – An Introduction, Perth, 2006.
Dyah Ika Rinawati, “Penentuan Waktu Baku Dengan Metode Work Sampling Untuk Menentukan Jumlah Tenaga Kerja Optimal”, J@TI Undip,Vol VII, September, 2012.
M. Ardi Zailani, “Kajian teknis peningkatan korelasi rencana cycle time alat angkut di pit kwest pt. kaltim prima coal kalimantan timur,” Skripsi, Fakultas Teknik Pertambangan, Univ Sriwijaya, Sumatra Selatan, 2014.
Pemindahan Tanah Mekanis dan Alat Berat, Universitas Semarang, Semarang University Press, Semarang, 2008.
R. Peurifoy, Construction, Planning, Equipment, and Methods, 7th Edition., Mc Graw Hill, Inc., 2006.
Pengendalian Mutu Dalam Industri Batubara, Institut Teknologi Bandung, Bandung, 2006.
Rizqi Mustaqim, “Studi Produktivitas Alat Gali Muat Berdasarkan Spesific Swing Angle : Studi Kasus Pit C PT. International Prima Coal, Samarinda, Kalimantan Timur,” Skripsi, Fakultas Teknik Pertambangan, Univ. Islam Negeri Syarif Hidayatullah, Jakarta, 2019.
Wafindra Deniswara, “Produktivitas alat gali muat berdasarkan swing angle top loading dan bottom loading”, Jurnal Inovasi Pertambangan dan Lingkungan, Vol. 3, April, 2023.
DOI: https://doi.org/10.20527/jhs.v10i1.14986
Refbacks

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Contact
Mining Engineering Study Program, Faculty of Engineering ULM
Jl. Jenderal Achmad Yani KM 35,5 Banjarbaru,
South Kalimantan – 70714
statistics counter
View My Stats Jurnal Himasapta
Jurnal Himasapta is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License