ANALYSIS OF PRODUCTIVITY AND COST OF HEAVY EQUIPMENT IN GRADED PAVEMENT WORK ON THE SYAMSUDIN NOOR INTERNATIONAL AIRPORT ACCESS ROAD CONSTRUCTION PROJECT

Muhammad Ikhsan Alfandi, Abdul Karim

Abstract


This study aims to analyze the productivity and costs of heavy equipment used in granular pavement work on the Syamsudin Noor International Airport access road construction project. The analysis focuses on evaluating the performance and cost-effectiveness of various types of equipment, including wheel loader, dump trucks,motor grade, water tanker truck and vibratory roller. Data were collected through field observations and contractor reports, which were then analyzed using productivity calculation methods and cost analysis techniques. The results show that proper equipment management and optimization significantly impact project efficiency and budget control. This research provides valuable insights for improving the planning and execution of similar infrastructure projects.

Keywords: productivity, heavy equipment, cost analysis, granular pavement, airport access road


Full Text:

PDF

References


Ahuja, H. N., Dozzi, S. P., & AbouRizk, S. M. (1994). Project Management: Techniques in Planning and Controlling Construction Projects. Wiley.

Arditi, D., & Lee, D. E. (2003). Assessing the cost effectiveness of quality management practices in construction. Journal of Construction Engineering and Management, 129(1), 96-103.

Callahan, M. T., Quackenbush, D. G., & Rowings, J. E. (1992). Construction Project Scheduling. McGraw-Hill.

Clough, R. H., Sears, G. A., & Sears, S. K. (2000). Construction Project Management. John Wiley & Sons.

Hendrickson, C. (2008). Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects, and Builders. Prentice Hall.

Kramer, C. (2019). Heavy equipment productivity analysis for road construction projects. International Journal of Construction Management, 19(4), 345-352.

Levin, P. (1998). Construction Contract Claims, Changes & Dispute Resolution. ASCE Press.

Peurifoy, R. L., Schexnayder, C. J., Shapira, A., & Schmitt, R. L. (2011). Construction Planning, Equipment, and Methods. McGraw-Hill.

Soeharto, I. (1999). Project Management: From Conceptual to Operational. Erlangga.

Willis, C. J., & Willis, J. A. (1986). Practice and Procedure for the Quantity Surveyor. Collins Professional and Technical Books.




DOI: https://doi.org/10.20527/crc.v9i1.14687

Refbacks

  • There are currently no refbacks.


Copyright (c) 2025 Muhammad Ikhsan Alfandi, Abdul Karim



Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License. 

joomla
statistics View My Stats

Indexed By:

 

GOOGLE SCHOLAR : Kutipan = 2, H-index = 1, i10-index = 0