ANALYSIS OF PROJECT EFFECTIVENESS COMPARISON WITH AND WITHOUT USING COST BUDGET PLAN AND TIME SCHEDULE USING PRECEDENCE DIAGRAM METHOD SCHEDULING
Abstract
Good project planning can minimize delays, high costs, and technical adjustments. However, the Nusa Guest House project in Banjarbaru by CV Senusa Group was carried out without comprehensive planning and without involving a formal planning consultant, relying only on floor plans and workers' experience. This study aims to evaluate the effectiveness of projects with and without planning by analyzing the Budget Plan and schedule using the Precedence Diagramming Method (PDM). The compiled budget shows a cost of Rp 2,918,133,500, while the owner allocated Rp 4,406,000,000, resulting in a difference of Rp 1,487,866,500 (excluding VAT). After adding 12% VAT, the difference becomes Rp 1,666,410,480. The project runs for 564 days, from January 2, 2023 to September 12, 2024, with 85% progress achieved. The study concludes that lack of comprehensive planning increases the risk of inefficiency in cost and time.
Keywords: Project Planning, Budget Plan, Time Schedule, PDM
Full Text:
PDFReferences
Natalie Graciella, T. T. (2024). Perhitungan Rencana Anggaran Biaya (RAB) Pekerjaan Arsitektur Pada Proyek Konstruksi Ruko Puri Kelapa Gading Minahasa Utara. Tekno.
Putra, I. N. (2022). Analisis Penjadwalan Dengan Menggunakan Precedence Diagram Method (PDM) Berbasis Microsoft Project (Studi Kasus: Pembangunan Lab. Kesehatan Daerah Kabupaten Bangli).
Suparno. (2015). PERENCANAAN DAN PENJADWALAN PROYEK PADA PEMBANGUNAN GEDUNG . Bangun Rekaprima.
DOI: https://doi.org/10.20527/crc.v10i6.19341
Refbacks
- There are currently no refbacks.
Copyright (c) 2026 Muhammad Bahrani, Endah Widiastuti, Nada Salsabila

This work is licensed under a Creative Commons Attribution 4.0 International License.
Indexed By:
GOOGLE SCHOLAR : Kutipan = 2, H-index = 1, i10-index = 0