PLANNING IMPLEMENTATION OF TIME ON REPEATING PROJECT WITH LINE OF BALANCE METHOD
Abstract
Some projects have cleared units of similar or exactly the same on the field. Multi - unit project is classified as very rarely activities is in many cases arise from a general breakdown of activities into specific activities. The purpose of this research to determine the time required when using heading the Line of Balance as an alternative model of the development of housing projects in Banjarmasin in terms of implementation time. At the Permata Regency Perumnas V has a repetitive activity used Line of balance. LOB is a scheduling method that is "generally used for projects that have a repetitive activity this method is able reserves to demonstrate the utilization of resources, either in the form of labor, equipment or materials without interruption. LOB Application of the housing project. Permata Regency Perumnas V has a 118 days project completion time for 17 units and continuity of the work becomes more regular. By expanding the number of locations / units will work to accelerate the overall project completion time .
Keywords : Time Line of Balance, Precious Regency
Full Text:
PDFReferences
Wardhana, Henry. 1994. Schedule planning on local Road Project with the scheduling method Linear. The thesis of fields of study Management and engineering construction, Masters Program in Civil Engineering at the Bandung Institute of Technology
Simamora, Yenywaty. 2006. S'diversified growth strategy quickly handling Post -tsunami housing in Nanggroe Aceh Darussalam (NAD). Field Thesis The study of Management and Engineering Construction, Masters Program Lambung Mangkurat University Civil Engineering.
Artama, Wiguna & Nurcahyono. 2012. The implementation of Repetitive Scheduling The scheduling method The road project Tubaan- Talisayan/ Dumaring, East Kalimantan Province. Engineering journal POMITS Vol. 1, No. 1, 1-6.
Wiranata. Diah Parami D & I Made Nuryawan. 2009 . The use of The scheduling method repeatedly (Repetitive Scheduling Method) On the making of the Housing Project (Case Study On The Housing Project Home Mumbul), scientific journals Civil Engineering, Vol. 13 No. 2, 174-182, July.
Suhartini & Rr. Indah Kusuma Wardani. 2016. With the approach of Project Performance Optimization Repetitive Schedule Method, Seminar IENACO National, ISSN: 2337 - 4349.
Budi Laksito. 2005. The comparative study Repetitif Construction Project Scheduling Using Metode Penjadwalan repeatedly (RSM) and method of precedent (PDM Diagram). Media Civil Engineering/ July/ 2005.
DOI: https://doi.org/10.20527/crc.v1i3.904
Refbacks
- There are currently no refbacks.
Copyright (c) 2019 Cerucuk. Prodi S1 T. Sipil.
This work is licensed under a Creative Commons Attribution 4.0 International License.
Indexed By:
GOOGLE SCHOLAR : Kutipan = 2, H-index = 1, i10-index = 0