SCHEDULING STUDY USING THE PDM METHOD IN THE PIANGGU-LALAP ROAD RECONSTRUCTION PROJECT (SUPPORTING THE FOOD ESTATE - DAK) IN AWANG DISTRICT, EAST BARITO REGENCY, CENTRAL KALIMANTAN
Abstract
The Pianggu-Lalap Road Reconstruction Project in Awang District, East Barito Regency, is a district road project by the PUPR Office. Initially, scheduling only used the S-curve without considering the relationship between activities, which caused delays. This research reconstructs the schedule using the Precedence Diagram Method (PDM) through the stages of WBS, duration determination, activity linkage analysis, and scheduling with Microsoft Project 2019. The results are displayed in Gantt Chart and Network Diagram, with a total duration of 142 days, from July 4 to November 19, 2024
Keywords: Scheduling, Precedence Diagram Method (PDM), Microsoft Project 2019
Full Text:
PDFReferences
Darmawan, D., & Ratnasari, A. (2020). Design of a Web-Based Project Management Information System at Pt Seatech. Sisfokom Journal (Information and Computer Systems), 9(3), 365-372.
Fahrian, Haryanto, B., & Jamal, M. (2021). Comparison of Project Scheduling with Pdm (Precedence Diagram Method) & Cpm (Critical Path Method) (Case Study: Continued Construction of the Samarinda Islamic Center Sd Building Project). Journal of Civil Technology, 5(2), 17.
Gazalba, Z., W arka, P., & Wirahman, L. W. (2022). Evaluation of the Reasonableness of the Contractor's Schedule Using Work Breakdown Structure (Wbs) and Microsoft Project (Study on the Sdn 5 Sokong Development Project, Tanjung, North Lombok). Ganec Swara Journal, 16(1), 1285.
Muhammad, A., Kurniawan, B., Mufidah, A. P., David, L., Bin, M., Dai, L., Pakarbudi, A., Information Systems, J., Adhi, T., & Surabaya, T. (2021). Critical Path Analysis on Information System Development Project Scheduling Using Critical Path Method (Cpm) Technique (Case Study: Pt. Xyz).
Pinanggi, A. O., Karim, A., & Widiastuti, E. (2025). Scheduling Analysis Using The Precedence Diagram Method (Pdm) In The Phase Ii Bridge Construction Project In Pejambuan Village, Sungai Tabuk District, Banjar Regency, South Kalimantan. Cerucuk, 9(2), 71-79.
Satriani, G., Amalia, V., & Ngizudin, R. (2024). Penerapan Program Microsoft Project 2019 Pada Proses Produksi Pembuatan 2500 Yard Kain Batik Di Pt. Bintang Tri Putratex. Jurnal Limit Multidisiplin, 1(1), 24–30.
DOI: https://doi.org/10.20527/crc.v10i7.20797
Refbacks
- There are currently no refbacks.
Copyright (c) 2026 Rika Sapitri, Eliatun Eliatun

This work is licensed under a Creative Commons Attribution 4.0 International License.
Indexed By:
GOOGLE SCHOLAR : Kutipan = 2, H-index = 1, i10-index = 0